Power Grid
ERCOT 4CP Explained: The Four Summer Peaks
ERCOT 4CP sets Texas transmission charges from four 15-minute summer peaks. The rule, the 700 kW threshold, the 2024–2025 peaks and the 12CP proposal.
9/12/20267 min
Power Grid
How a Grid Forecast Is Built
A grid forecast runs from ERCOT's 168-hour load outlook to PJM's 20-year peak outlook. The inputs, the published feeds, and how 2026 forecasts held up.
9/12/20266 min
Power Grid
SPP Footprint: How the Power Pool Grew
The SPP footprint now spans all or part of 17 states and two interconnections. What the April 2026 western RTO expansion added, and what comes next.
9/12/20266 min