Live
Grid conditions by operator
Load, fuel mix, real-time prices and alerts for eight markets. Where a figure is missing, the page says so instead of showing a zero.
On the record
- Operators
- 8
- Combined load, latest reading
- 429 GW
Live conditions across 8 grid operators. Every utility-scale US power plant, mapped by fuel and by state. Every data centre on record. And close readings of the interconnection rules that decide what gets built.
What this site is
Each one carries the date it was last updated on every page.
Live
Load, fuel mix, real-time prices and alerts for eight markets. Where a figure is missing, the page says so instead of showing a zero.
On the record
Directory
The full operating inventory, split into fuel families and a page per state, with county, unit count, operating year and status on every plant. Planned projects are kept on separate pages so an operating count is never inflated.
On the record
Directory
No complete roster of US data centres exists. This is every facility on record, labelled row by row, and presented as a floor rather than a census.
On the record
Insight
Interconnection is where projects die, and the rules live in filings nobody outside the docket reads. Each piece is a close reading of the rules themselves.
On the record
Power plants
Updated 2026-07. Each family has a national map and a page for every state that has one.
Most searched: nuclear power plants in the United States, nuclear power plants in Illinois, Texas wind farms.
Insight
Close readings of the orders, tariffs and rules that decide interconnection.
Neither service conveys transmission service. The difference is whether your plant gets studied — and upgraded — so it can be designated a Network Resource.
10 min readThe 2025 allocation cycle slid a year. There is no 2026 TPD allocation, and Cluster 15 cannot seek deliverability until March 2027.
9 min readA HILL is 50 MW above 69 kV, or 10 MW at or below it. HILLGA lets one generator be fast-tracked to serve it — within tight limits.
10 min readA $2.24bn premium that narrows to $1.35bn, 1,400 fewer rebuild miles, and roughly $230m a year in consumer energy savings.
9 min readA gigawatt campus would post $50 million before energising, and loads connected after 31 December 2025 can be curtailed during firm load shed.
9 min readGrid history
4 datasets, 2,118,185 rows, captured over time so the changes are visible.
Also here
The calculators this site started with. They still work, and they are still maintained.