← Grid archive

Grid needs, and the projects meant to fix them

PG&E publishes what each substation bank will be short through 2040, and — separately — the original and current in-service date of every planned fix. The gap between those two dates is what a developer hanging a project off that substation is actually waiting on.

Planned projects
360
278 publish both dates
Already slipping
80
29% of those with both dates
On or ahead of plan
198
current date not later than original
Worst slip on record
2,861 d
Install Terminous Bank 2 and 2 new feeders

Substation bank deficit, 2026–2040

Summed across 1,258 banks. Bank level only — feeders roll up into banks, and charting both would count the same gap twice.

152 banks are short in 2026; by 2040 that is 532.

What is driving the need

Primary driver, where PG&E states one.

  • Demand Growth1,392
  • In-flight project near completion13
  • Non-strategic hour overload13
  • Completing LOOP (or) BACK TIE12
  • Long-term overload12
  • Feeder > 600 Amps Project, Completing LOOP (or) BACK TIE, Emergency Bank Loss Project10
  • Feeder > 600 Amps Project, Long-term overload, Completing LOOP (or) BACK TIE9
  • In-flight project near completion, Completing LOOP (or) BACK TIE9

Banks with the largest 2040 gap

Top 25 by forecast deficit.

SubstationBankDivisionDriverNeed by2030 (MW)2040 (MW)
NEWARKNEWARK BANK 21MissionDemand Growth202615.9112.1
SANTA TERESA NEW ( (2021)SANTA TERESA NEW BANK 1( (2021)San JoseDemand Growth202731.4108.3
MT EDENMT EDEN BANK 2MissionDemand Growth20286.8104.7
EAST GRANDEAST GRAND BANK 4PeninsulaDemand Growth202745.1101.7
EDESEDES BANK 3East BayDemand Growth202819.493.9
STONESTONE BANK 2San JoseDemand Growth202817.066.1
MT EDENMT EDEN BANK 1MissionDemand Growth20291.866.0
HICKSHICKS BANK 1San JoseDemand Growth202621.358.1
MONTAGUEMONTAGUE BANK 2San JoseDemand Growth202616.150.2
TRIMBLETRIMBLE BANK 3San JoseDemand Growth202711.847.0
HICKSHICKS BANK 2San JoseDemand Growth202615.746.5
PIERCYPIERCY BANK 3San JoseDemand Growth202610.244.8
LAS POSITASLAS POSITAS BANK 2MissionDemand Growth202713.844.8
SARATOGASARATOGA BANK 2De AnzaDemand Growth202613.444.4
TIDEWATERTIDEWATER BANK 1DiabloDemand Growth20320.043.8
MEADOW LANEMEADOW LANE BANK 3DiabloDemand Growth20310.043.2
MONTAGUEMONTAGUE BANK 3San JoseDemand Growth20302.142.8
SAN RAMONSAN RAMON BANK 4MissionDemand Growth202715.642.6
SARATOGASARATOGA BANK 3De AnzaDemand Growth202616.640.1
EDENVALEEDENVALE BANK 2San JoseDemand Growth20266.639.3
VINEYARDVINEYARD BANK 2MissionDemand Growth202614.538.9
PAUL SWEETPAUL SWEET BANK 2Central CoastDemand Growth20320.038.3
SALINASSALINAS BANK 6Central CoastDemand Growth20284.737.8
MILPITASMILPITAS BANK 2San JoseDemand Growth202617.237.6
WHISMANWHISMAN BANK 2De AnzaDemand Growth20270.037.3

Planned projects, worst slip first

All 360 rows. "Slip" is the current expected in-service date minus the original — PG&E publishes both, so this much is visible today; how the current date moves month to month is what only an archive can show.

ProjectTypeStatusOriginal ISDCurrent ISDSlip
Install Terminous Bank 2 and 2 new feedersSubstation UpgradesPre-execution2024-07-012032-05-01+2,861 d
Tracy 4kV CutoverNew or upgraded circuitPre-execution2024-12-302031-09-01+2,436 d
Gabilan - Install Bank 2Substation UpgradesPre-execution2024-12-312030-06-01+1,978 d
BACKTIE - GONZALES 1102New or upgraded circuitOn-going2022-10-302027-12-04+1,861 d
GLENN 1101 - RECONDUCTOR 2CU W/ 397 ALNew or upgraded circuitOn-going2022-11-302027-12-31+1,857 d
New Caruthers 1106 FeederNew or upgraded circuitPre-execution2024-12-312029-11-01+1,766 d
LE GRAND 1110 RECONDUCTORINGNew or upgraded circuitPre-execution2023-12-282028-05-01+1,586 d
Chualar Substation: Inst Transf BankSubstation UpgradesPre-execution2024-12-312029-03-02+1,522 d
New Caruthers 1106 FeederNew or upgraded circuitPre-execution2025-09-222029-11-02+1,502 d
SISQUOC 1102 - INSTALL 2 CAP BANKSSubstation UpgradesPre-execution2024-12-302028-12-31+1,462 d
Buellton - Replace Bank 1 with 45MVA Bank and add new 1103 feederSubstation UpgradesPre-execution2026-06-302030-06-01+1,432 d
Buellton - Replace Bank 1 with 45MVA Bank and add new 1103 feederSubstation UpgradesPre-execution2026-12-302030-06-01+1,249 d
JOHNSON CANYON SUB - LAND PURCHASESubstation UpgradesPre-execution2027-12-312030-12-31+1,097 d
TULARE LAKE SUB - INSTALL 1105 FEEDERNew or upgraded circuitOn-going2027-10-042030-07-05+1,005 d
SAN JOAQUIN SUB: NEW BK 2, 1113 FDRSubstation UpgradesOn-going2026-11-272029-05-02+887 d
HENRIETTA 1110 OL AND LV CORRECTIONNew or upgraded circuitPre-execution2026-04-302028-06-01+763 d
06D - MESA 1101 - REG R542 UPGRADENew or upgraded circuitPre-execution2026-05-282028-06-01+735 d
Mendota - Install Bank 1New or upgraded circuitPre-execution2024-12-302027-01-01+732 d
SHAFTER 1103 DIST LINE AND RECONDUCTORNew or upgraded circuitPre-execution2026-06-232028-06-01+709 d
CHOWCHILLA 1104 RECONDUCTORNew or upgraded circuitPre-execution2026-03-312027-12-31+640 d
CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4New or upgraded circuitOn-going2025-02-072026-09-30+600 d
HOLLISTER 2105 CUTOVER AND AUTOTX INSTNew or upgraded circuitOn-going2024-12-302026-08-17+595 d
INSTALL 2 CAP BKS - SANTA NELLA 1104New or upgraded circuitPre-execution2025-09-042027-04-15+588 d
REPLACE 557058 ON DAIRYLAND 1102New or upgraded circuitPre-execution2026-05-312027-12-31+579 d
DLINE RECOND LOS OSITOS 2103 BCKTIE- PT3New or upgraded circuitPre-execution2025-08-292026-11-16+444 d
REEDLEY DPA - REPLACE OVERLOADED REGSNew or upgraded circuitOn-going2025-11-102027-01-15+431 d
LAMMERS NEW 1109 & 1110 FEEDERSSubstation UpgradesOn-going2027-03-012028-05-01+427 d
35566024 _SANTA NELLA 1600' OH CONDUCTORNew or upgraded circuitOn-going2026-03-172027-05-05+414 d
SHEPHERD - INSTALL 2108 DIST WORKSubstation UpgradesPre-execution2026-12-012028-01-02+397 d
SHEPHERD - INSTALL 2108 DIST WORKSubstation UpgradesPre-execution2026-12-012028-01-01+396 d
RECONDUCTOR FOLETTA RD -GONZALES 1104New or upgraded circuitOn-going2026-07-232027-08-23+396 d
DEL MONTE 2104 & R.R.1101 CKT REINFRCMNTNew or upgraded circuitOn-going2026-06-102027-07-07+392 d
OH RECONDUCTOR HOL 2105 FAIRVIEW RDNew or upgraded circuitOn-going2025-09-262026-10-16+385 d
KINGSBURG 1113 - RECONDUCTORING 6CNew or upgraded circuitPre-execution2026-07-132027-07-13+365 d
LAMONT 1106 RECONDUCTORNew or upgraded circuitPre-execution2027-05-192028-05-16+363 d
MAGUNDEN 1105 OL CONDUCTORNew or upgraded circuitOn-going2027-02-262027-12-22+299 d
KERMAN 1103 - RECONDUCTORNew or upgraded circuitOn-going2026-08-212027-06-01+284 d
HERDLYN 1102 RECONDUCTOR - BETHANY RDNew or upgraded circuitOn-going2027-08-272028-05-02+249 d
REINFORCE KC 1101 & 1103New or upgraded circuitOn-going2026-04-072026-12-02+239 d
STOREY 1108 OH DISCONNECT REPLACEMENTNew or upgraded circuitPre-execution2025-09-022026-04-27+237 d
WAHTOKE 1107 - CREATE A BACK TIENew or upgraded circuitOn-going2026-04-272026-12-11+228 d
COALINGA NO 1 1108 RECON FOR NBNew or upgraded circuitOn-going2026-05-222026-12-15+207 d
CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4New or upgraded circuitOn-going2027-04-192027-10-29+193 d
McCall 1103 Reconductoring 2nd PhaseNew or upgraded circuitPre-execution2026-04-132026-10-22+192 d
MIDWAY SUB: REPLACE BANK 8Substation UpgradesOn-going2027-06-292028-01-01+186 d
REPLACE LR 6502 - CLARKSVILLE 2109New or upgraded circuitPre-execution2026-12-162027-06-15+181 d
MAGUNDEN2108-2109New or upgraded circuitOn-going2027-01-042027-06-29+176 d
NEW VIERRA 1708 FEEDERSubstation UpgradesOn-going2028-03-292028-09-05+160 d
Borden 1102 Bank Repl & EquipmentSubstation UpgradesPre-execution2027-12-312028-06-01+153 d
EL NIDO 1101 RECONDUCTORNew or upgraded circuitOn-going2026-10-292027-03-25+147 d
MIDWAY 1101 AND MIDWAY 1103 RECONDUCTORNew or upgraded circuitPre-execution2026-02-192026-07-12+143 d
MOMENTUM SUBSTATION:DIST FDR WO (2027)Substation UpgradesOn-going2027-08-022027-12-21+141 d
DLINE RECOND LOS OSITOS 2103 BCKTIE- PT3New or upgraded circuitOn-going2026-10-192027-03-03+135 d
CORNING 1103 RECONDUCTOR 6200 FT W/715ANew or upgraded circuitPre-execution2028-06-012028-10-11+132 d
NEW FEEDERS AT COLUMBUSNew or upgraded circuitOn-going2028-07-242028-12-01+130 d
AUBERRY 1101 INSTALL VOLTAGE REGULATORNew or upgraded circuitOn-going2026-09-162026-12-30+105 d
PEORIA 1704 RECONDUCTOR, CAPS, REGSNew or upgraded circuitOn-going2027-08-022027-11-05+95 d
BLACKWELL 2101 INSTALL BACK-TIE_06HNew or upgraded circuitOn-going2027-04-302027-07-03+64 d
ESQUON 1102: INSTALL CLSE DLTA REGULATORNew or upgraded circuitOn-going2026-03-202026-05-01+42 d
LAKEVIEW: INSTALL 1108 FEEDERNew or upgraded circuitOn-going2026-10-212026-11-30+40 d
EL CAPITAN -NEW CIRCUIT 2111 OUTLETSubstation UpgradesPre-execution2028-12-292029-02-06+39 d
New Vierra 1704 FeederNew or upgraded circuitOn-going2026-09-112026-10-16+35 d
EIGHT MILE 2106 FEEDER EXTENSION PH 1New or upgraded circuitOn-going2027-07-282027-08-30+33 d
FOOTHILL BANK 1 UPGRADE-DIST WORKSubstation UpgradesOn-going2028-05-032028-06-01+29 d
EIGHT MILE 2106 FEEDER EXTENSION PH 1New or upgraded circuitOn-going2027-07-302027-08-25+26 d
Install San Bernard Bank 2Substation UpgradesOn-going2026-10-302026-11-23+24 d
SUMMIT 1102 MAINLINE RECONDUCTORNew or upgraded circuitOn-going2026-11-042026-11-17+13 d
CHARCA INSTALL 1101 DIST. CIRCUITNew or upgraded circuitOn-going2026-08-312026-09-11+11 d
Borden 1102 Bank Repl & EquipmentSubstation UpgradesOn-going2029-02-212029-03-02+9 d
Tracy 4kV CutoverNew or upgraded circuitOn-going2027-06-302027-07-08+8 d
Buellton 1101 - Install 100A regulatorNew or upgraded circuitPre-execution2026-04-232026-05-01+8 d
COTTONWOOD 1103 RECONDUCTORNew or upgraded circuitCompleted2026-06-052026-06-09+4 d
WEBER_REPL_BANK 4_DIST SUBSubstation UpgradesCompleted2026-05-262026-05-29+3 d
SOUTH FRESNO OVERLOAD RELIEF T LIINENew or upgraded circuitOn-going2026-04-302026-05-03+3 d
WAHTOKE SUB - INSTALL 1102 FEEDERNew or upgraded circuitPre-execution2029-09-282029-09-30+2 d
STOREY 1101 NEW FEEDERNew or upgraded circuitCompleted2026-04-152026-04-17+2 d
WHEELER RIDGE 21KV FEEDERS PH IISubstation UpgradesCompleted2025-10-302025-10-31+1 d
INSTALL NEW OH SW - FIREBAUGH 1101New or upgraded circuitPre-execution2026-03-262026-03-27+1 d
LEMOORE 1101 520' OF 6 CU REPL W/ 397ALNew or upgraded circuitCompleted2025-12-242025-12-25+1 d
RE-ROUTE FRENCH CAMP FEEDERSSubstation UpgradesPre-execution2030-05-312030-06-01+1 d
STAGG 1101 LR 9212 OVERLOAD RPLNew or upgraded circuitCompleted2026-05-052026-05-050 d
PANOCHE SUB: INSTALL 21V BANKSubstation UpgradesOn-going2026-11-162026-11-160 d
FRENCH CAMP BACKTIENew or upgraded circuitCompleted2026-03-302026-03-300 d
CARBONA 1104 RECOND W/397ALNew or upgraded circuitOn-going2026-12-292026-12-290 d
*WHEELER RIDGE 1101 REPLACE OH FUSESNew or upgraded circuitCompleted2025-10-052025-10-050 d
VIERRA 1706 I-5 RECONDUCTORINGNew or upgraded circuitCompleted2026-04-262026-04-260 d
GATES 1102 RECONDUCTORNew or upgraded circuitCompleted2025-12-192025-12-190 d
GANSO 1104 OL AND LOW VOLTAGENew or upgraded circuitCompleted2026-07-082026-07-080 d
RECON 3500' TEMPLETON 2019, UNION RD. PRNew or upgraded circuitCompleted2026-07-012026-07-010 d
INSTALL NEW REGULATOR - LOS OSITOS 2103New or upgraded circuitCompleted2025-12-042025-12-040 d
INSTALL NEW OH SW - MENDOTA 1103New or upgraded circuitPre-execution2026-03-272026-03-26-1 d
COTTONWOOD 1103 RECONDUCTORNew or upgraded circuitCompleted2026-04-242026-04-23-1 d
SOUTH FRESNO OVERLOAD RELIEF T LIINENew or upgraded circuitCompleted2026-05-072026-05-06-1 d
EP-OCE 1106 NB RECOND HIGHLAND,OCEANONew or upgraded circuitCompleted2025-11-142025-11-13-1 d
LINCOLN 1101-CAPACITYNew or upgraded circuitOn-going2026-12-312026-12-29-2 d
WEBER_REPL_BANK 4_DIST SUBNew or upgraded circuitCompleted2026-05-262026-05-23-3 d
LAKEVIEW 1103 RECONDUCTORNew or upgraded circuitOn-going2026-08-102026-08-07-3 d
Airways Install Switchgear 3New or upgraded circuitOn-going2026-06-262026-06-23-3 d
Install Madera 1110 FeederNew or upgraded circuitCompleted2026-01-142026-01-10-4 d
Coalinga No.1 1105 New Feeder with Bank 2 upgradeSubstation UpgradesOn-going2026-08-142026-08-10-4 d
New Airways Bank 3 and New Airway 1110Substation UpgradesOn-going2026-06-292026-06-23-6 d
EIGHT MILE 2106 FEEDER EXTENSION PH 1New or upgraded circuitOn-going2027-08-312027-08-24-7 d
DIVIDE 1102 RECON (UNION AVE/PINAL AVE)New or upgraded circuitOn-going2026-12-302026-12-23-7 d
PANAMA 2101 21KV ML EXTENSION AND BACKTINew or upgraded circuitOn-going2027-01-042026-12-24-11 d
SLO 1107 UG SRCNew or upgraded circuitOn-going2026-12-302026-12-17-13 d
NEW SAN MIGUEL BK 3 SM 2106 FDR(TLINESubstation UpgradesOn-going2027-07-302027-07-16-14 d
CARUTHERS 1102 RECONDUCTORINGNew or upgraded circuitOn-going2026-08-212026-08-07-14 d
PENRYN 1106 RECONDUCTORINGNew or upgraded circuitOn-going2027-12-302027-12-15-15 d
ROCKLIN 1102 - PH1New or upgraded circuitCompleted2026-07-162026-06-30-16 d
BANTA: REPL BANK 1Substation UpgradesCompleted2026-02-272026-02-11-16 d
CALFLAX BANK 2 D-WORK - PHASE IINew or upgraded circuitOn-going2026-09-222026-09-04-18 d
WASCO 1104 RECONDUCTORNew or upgraded circuitOn-going2026-10-212026-09-30-21 d
ROCKLIN 1102 - PH1New or upgraded circuitCompleted2026-07-302026-07-09-21 d
MONTEREY - NEW 21KV FEEDERSNew or upgraded circuitCompleted2026-05-302026-05-05-25 d
MWC 46/06 - New Fairway 1102 FeederNew or upgraded circuitOn-going2027-12-132027-11-17-26 d
EL Nido 1101 ReconductoringNew or upgraded circuitOn-going2027-06-252027-05-28-28 d
ORO FINO 1102 - RECONDUCTOR TIER 3 HFTDNew or upgraded circuitOn-going2026-06-292026-06-01-28 d
Install Madera 1110 FeederNew or upgraded circuitCompleted2026-05-202026-04-22-28 d
STOCKDALE 2113 1100CU RECONDUCTORNew or upgraded circuitPre-execution2028-06-302028-06-01-29 d
Reedley 1106 feeder outlet recondcutorNew or upgraded circuitOn-going2027-02-192027-01-15-35 d
ED-FUTURE PR 1103 - INSTALL 2 CAPACITORNew or upgraded circuitCompleted2026-01-222025-12-16-37 d
CURTIS 1703 RECONDUCTOR WORK_PH1New or upgraded circuitPre-execution2027-07-062027-05-27-40 d
LOS OSITOS 2103 MAINLINE STEPDOWN - PT2New or upgraded circuitCompleted2026-07-202026-05-29-52 d
DLINE RECOND LOS OSITOS 2103 BCKTIE- PT3New or upgraded circuitOn-going2027-01-062026-11-13-54 d
LERDO 1116 RECONDUCTORNew or upgraded circuitPre-execution2026-02-252026-01-01-55 d
Airways Install Switchgear 3Substation UpgradesOn-going2028-07-282028-06-01-57 d
BUENA VISTA 1106 CIRCUIT REINFORCEMENTNew or upgraded circuitOn-going2027-04-292027-03-03-57 d
BANTA BK 1 - D LINE SEGMENT 1Substation UpgradesCompleted2026-01-212025-11-14-68 d
TP2110_RECONDUCTOR WILLOW CREEK RDNew or upgraded circuitOn-going2027-03-302027-01-19-70 d
CORNING 1101 RECOND FEEDER OUTLETNew or upgraded circuitCompleted2026-07-262026-05-10-77 d
Castroville 2103 - Backtie ReinforcementNew or upgraded circuitOn-going2027-03-092026-12-17-82 d
OLD RIVER INSTALL 1106 DIST. CIRCUITNew or upgraded circuitOn-going2026-12-312026-10-08-84 d
BANTA BK 1 - D LINE SEGMENT 1Substation UpgradesOn-going2027-05-242027-02-24-89 d
CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4New or upgraded circuitOn-going2026-12-282026-09-30-89 d
RISING RIVER RECONDUCTOR 4300 FT (2026)New or upgraded circuitOn-going2026-12-302026-10-01-90 d
EIGHT MILE 2106 FEEDER EXTENSION PH 1New or upgraded circuitOn-going2027-08-272027-05-28-91 d
Tracy 4kV CutoverNew or upgraded circuitOn-going2027-04-302027-01-29-91 d
INSTALL 7TH STANDARD 2106 FEEDERSubstation UpgradesOn-going2027-08-232027-05-21-94 d
SPENCE 1101 UNDER SOLEDAD #1 T-LINENew or upgraded circuitOn-going2027-01-042026-09-30-96 d
Replace Weber BK3 and install Weber 1117New or upgraded circuitCompleted2026-04-142026-01-08-96 d
SAN BERNARD 1101- RECONDUCTOR 4CUNew or upgraded circuitOn-going2027-05-272027-02-05-111 d
Lakeview 1108 Repl T PolesNew or upgraded circuitOn-going2026-10-212026-06-30-113 d
WRIGHT 1110 OFFLOADNew or upgraded circuitCompleted2026-03-022025-10-30-123 d
CRESCENT SW STA-SCHINDLER - RPL PLNew or upgraded circuitOn-going2026-09-262026-05-26-123 d
CHARCA INSTALL 1101 DIST. CIRCUITNew or upgraded circuitOn-going2028-10-062028-06-01-127 d
SAND CREEK 1103 RECONDUCTOR - SEGMENT 3New or upgraded circuitPaused2028-12-292028-08-23-128 d
CRESCENT SW STA-SCHINDLER - RPL PLNew or upgraded circuitCompleted2026-10-032026-05-25-131 d
CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4New or upgraded circuitOn-going2026-12-312026-08-20-133 d
NEW VIERRA 1708 FEEDERSubstation UpgradesOn-going2029-01-172028-09-04-135 d
BANTA BK 1 - D LINE SEGMENT 1Substation UpgradesOn-going2028-04-282027-12-10-140 d
EP-ATASCADERO 1103-REROUTE MAINLINENew or upgraded circuitOn-going2027-01-302026-09-11-141 d
MWC 46/06 Install Storey 1103 CircuitNew or upgraded circuitCompleted2026-04-302025-12-09-142 d
SAN JOAQUIN SUB: NEW BK 2, 1113 FDRSubstation UpgradesOn-going2029-09-262029-05-02-147 d
MIDWAY SUB: REPLACE BANK 8Substation UpgradesOn-going2026-12-292026-07-31-151 d
RECONDUCTOR EL CAMINO REAL (101 HWY)New or upgraded circuitOn-going2027-08-062027-03-03-156 d
WEBER - INSTALL FEEDER 1112New or upgraded circuitOn-going2028-04-032027-10-29-157 d
EIGHT MILE 2106 FEEDER EXTENSION PH 1New or upgraded circuitOn-going2027-12-062027-06-25-164 d
NEW FEEDERS AT COLUMBUSNew or upgraded circuitOn-going2029-05-172028-12-02-166 d
REINFORCE KC 1101 & 1103New or upgraded circuitOn-going2027-06-292027-01-12-168 d
ROCKLIN 1102 - PH1New or upgraded circuitCompleted2026-12-072026-06-11-179 d
COALINGA #1: REPLACE BANK 2Substation UpgradesOn-going2026-10-302026-04-24-189 d
NEW VIERRA 1708 FEEDERNew or upgraded circuitPre-execution2029-03-162028-09-05-192 d
REINFORCE CASTROVILLE 2103New or upgraded circuitCompleted2026-03-272025-09-15-193 d
New 30MVA bank-2Substation UpgradesOn-going2027-04-302026-10-15-197 d
CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4New or upgraded circuitOn-going2027-04-192026-09-30-201 d
INSTALL NEW RIPON 1705 FEEDERNew or upgraded circuitOn-going2027-07-022026-12-04-210 d
AUD-ATEJON 12 AND 21 KV LINE WK PKGE #1Substation UpgradesOn-going2026-12-312026-06-03-211 d
WEST FRESNO SUB - INSTALL 1114 FEEDERNew or upgraded circuitOn-going2027-11-292027-05-01-212 d
Replace Weber BK3 and install Weber 1117New or upgraded circuitCompleted2025-12-012025-05-03-212 d
WEST FRESNO SUB - INSTALL 1113 FEEDERNew or upgraded circuitOn-going2027-12-022027-05-01-215 d
CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4New or upgraded circuitOn-going2027-12-312027-05-25-220 d
Install San Bernard Bank 2Substation UpgradesCompleted2025-07-312024-12-20-223 d
INSTALL 7TH STANDARD 2106 FEEDERSubstation UpgradesOn-going2026-12-012026-04-22-223 d
INSTALL 7TH STANDARD 2106 FEEDERSubstation UpgradesOn-going2026-11-132026-03-31-227 d
CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4New or upgraded circuitOn-going2027-05-202026-09-30-232 d
Shady Glen - Replace Bus Substation UpgradesPre-execution2027-12-312027-05-10-235 d
KERN OIL 1107-1108 KERN IGPNew or upgraded circuitOn-going2028-08-242028-01-01-236 d
GUSTINE 1103-NEW CIRCUIT OUTLETSubstation UpgradesPre-execution2028-12-292028-05-02-241 d
STOREY 1101 NEW FEEDERNew or upgraded circuitOn-going2026-12-292026-04-30-243 d
Westpark1107 OverloadNew or upgraded circuitOn-going2026-12-012026-04-01-244 d
AUD-ATEJON 12 AND 21 KV LINE WK PKGE #1New or upgraded circuitOn-going2027-09-292027-01-01-271 d
TUPMAN 1107 1108 FEEDER DIST WORKNew or upgraded circuitCompleted2026-08-282025-11-26-275 d
New Airways Bank 3 and New Airway 1110Substation UpgradesCompleted2027-03-292026-06-24-278 d
TUPMAN 1104 - 12% OL ON 6C, RECOND TO 6CNew or upgraded circuitPre-execution2026-10-232026-01-01-295 d
INDUSTRIAL ACRES - 12KV CUTOVERSubstation UpgradesOn-going2027-09-282026-12-07-295 d
35253101 Oro Loma 1106 Reconductor TransferNew or upgraded circuitCompleted2025-11-232025-01-31-296 d
MALAGA SUB - RECONDUCTOR OUTLETSNew or upgraded circuitOn-going2027-11-102027-01-15-299 d
PANOCHE SUB: INSTALL 21V BANKSubstation UpgradesOn-going2027-02-262026-05-01-301 d
CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4New or upgraded circuitOn-going2027-11-302027-01-26-308 d
SPENCE 1101 UNDER SOLEDAD #1 T-LINENew or upgraded circuitOn-going2027-08-312026-10-24-311 d
INSTALL NEW ORTIGA 1101 & 1102 CIRCUITSSubstation UpgradesOn-going2027-11-302027-01-20-314 d
SPENCE 1101 UNDER SOLEDAD #1 T-LINENew or upgraded circuitOn-going2027-10-012026-11-21-314 d
WEBER_REPL_BANK 4_DIST SUBNew or upgraded circuitCompleted2027-04-202026-06-01-323 d
REINFORCE SALINAS 1106 - T&ANew or upgraded circuitOn-going2028-01-212027-03-03-324 d
06 - Extending New Lamont 1108 FeederNew or upgraded circuitPre-execution2029-03-232028-05-01-326 d
NEW SAN MIGUEL BK 3 SM 2106 FDR(TLINESubstation UpgradesOn-going2028-07-182027-08-10-343 d
New Feeders Goose Lake SubstationNew or upgraded circuitOn-going2028-05-092027-05-31-344 d
RECONDUCTOR RIVER ROAD - R.R. 1102New or upgraded circuitOn-going2028-02-102027-03-03-344 d
AUD-ATEJON 12 AND 21 KV LINE WK PKGE #1Substation UpgradesOn-going2027-12-232027-01-01-356 d
Santa Nella 1101 Reconductoring and New EquipmentNew or upgraded circuitCompleted2026-12-142025-12-19-360 d
Install Cassidy Bank 1 and 2109 FeederNew or upgraded circuitPre-execution2028-12-292028-01-02-362 d
FAMOSO 1101 - RECONDUCTORNew or upgraded circuitPre-execution2027-05-282026-05-31-362 d
WEEDPATCH 1106 CIRCUIT UPGRADENew or upgraded circuitPre-execution2027-04-302026-05-01-364 d
Install Cassidy Bank 1 and 2109 FeederSubstation UpgradesPre-execution2028-12-312028-01-01-365 d
ADD 3 CAPACITOR ON KING CITY 1106 FNew or upgraded circuitCompleted2027-06-282026-06-26-367 d
Replace Weber BK3 and install Weber 1117New or upgraded circuitCompleted2026-06-112025-06-04-372 d
CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4New or upgraded circuitOn-going2027-10-112026-09-30-376 d
EL NIDO 1104 RECONDUCTORNew or upgraded circuitCompleted2027-04-302026-03-30-396 d
INSTALL NEW ORTIGA 1101 & 1102 CIRCUITSSubstation UpgradesOn-going2027-10-132026-09-11-397 d
AIRWAYS 1107 OH RECONDUCTORNew or upgraded circuitOn-going2026-06-052025-05-04-397 d
OTTER 1102 BIG SUR RECONNew or upgraded circuitOn-going2028-11-302027-10-29-398 d
OTTER 1102 BIG SUR RECONNew or upgraded circuitOn-going2028-11-302027-10-29-398 d
OTTER 1102 BIG SUR RECONNew or upgraded circuitOn-going2028-11-302027-10-29-398 d
New Feeders Goose Lake SubstationNew or upgraded circuitOn-going2028-01-072026-11-30-403 d
NEW SAN MIGUEL BK 3 SM 2106 FDR(TLINESubstation UpgradesOn-going2027-02-122026-01-02-405 d
RECONDUCTOR EL CAMINO REAL (101 HWY)New or upgraded circuitOn-going2028-08-112027-06-30-408 d
COTTONWOOD INSTALL NEW FEEDERNew or upgraded circuitOn-going2029-02-152028-01-03-409 d
WEST FRESNO SUB - INSTALL 1113 FEEDERNew or upgraded circuitOn-going2028-06-162027-05-01-412 d
DESCHUETES 1101 4AR RECONDUCTORINNew or upgraded circuitCompleted2027-05-282026-04-08-415 d
06A - BORONDA 1102 FEEDER REINFORCMENTSubstation UpgradesOn-going2027-07-162026-05-22-420 d
INSTALL 7TH STANDARD 2106 FEEDERSubstation UpgradesOn-going2027-06-012026-03-31-427 d
ROCKLIN 1102 - PH1New or upgraded circuitOn-going2028-02-022026-12-02-427 d
INSTALL NEW RIPON 1705 FEEDERNew or upgraded circuitOn-going2029-09-142028-07-12-429 d
TULARE LAKE SUB - INSTALL 1105 FEEDERNew or upgraded circuitOn-going2029-08-032028-05-29-431 d
CAMDEN 1106 NEW FEEDER CAPACITYNew or upgraded circuitOn-going2029-03-152028-01-02-438 d
COTTONWOOD INSTALL NEW FEEDERNew or upgraded circuitOn-going2029-04-022028-01-03-455 d
MOMENTUM SUBSTATION:DIST FDR WO (2027)Substation UpgradesOn-going2029-04-092028-01-01-464 d
LAKEVIEW: INSTALL 1108 FEEDERNew or upgraded circuitOn-going2027-09-102026-06-01-466 d
DAIRYLAND 1111 - REGSNew or upgraded circuitCompleted2027-03-312025-12-20-466 d
OLD RIVER INSTALL 1106 DIST. CIRCUITNew or upgraded circuitCompleted2027-03-312025-12-08-478 d
ORLAND B BANK 1 REPLACEMENTSubstation UpgradesOn-going2029-07-022028-03-03-486 d
WEST FRESNO SUB - INSTALL 1114 FEEDERNew or upgraded circuitOn-going2028-08-312027-05-01-488 d
SAND CREEK 1103 RECONDUCTOR - SEGMENT 2New or upgraded circuitPaused2029-12-312028-08-29-489 d
21KV CUTOVER - SOLEDAD 2102 - T1457New or upgraded circuitOn-going2028-08-012027-03-03-517 d
CRESCENT SW STA-SCHINDLER - RPL PLNew or upgraded circuitOn-going2026-10-032025-05-01-520 d
FORT ORD 2107_CAPACITY_EXTENSION - OHNew or upgraded circuitOn-going2027-10-052026-04-23-530 d
HARDING: REPL 60/4KV BK 1Substation UpgradesOn-going2029-07-062027-12-31-553 d
EIGHT MILE 2106 FEEDER EXTENSION PH 1New or upgraded circuitOn-going2028-11-142027-05-07-557 d
AUD-ATEJON 12 AND 21 KV LINE WK PKGE #1Substation UpgradesOn-going2028-07-272027-01-11-563 d
MWC46/06 - Install Tevis Bk3New or upgraded circuitPre-execution2028-12-302027-06-02-577 d
06A - BORONDA 1102 FEEDER REINFORCMENTSubstation UpgradesOn-going2028-03-272026-08-26-579 d
TUPMAN 1107 1108 FEEDER DIST WORKSubstation UpgradesOn-going2029-02-132027-06-14-610 d
LOGAN CREEK 2103 PH1 (2027)New or upgraded circuitOn-going2029-01-312027-05-26-616 d
Templeton Bank 2 Upgrade Distribution Line WorkNew or upgraded circuitOn-going2028-10-162027-01-30-625 d
AUD-ATEJON 12 AND 21 KV LINE WK PKGE #1Substation UpgradesOn-going2028-07-312026-11-09-630 d
SPENCE 1101 UNDER SOLEDAD #1 T-LINENew or upgraded circuitOn-going2028-06-302026-09-30-639 d
WEBER 1112 - PH2 - FEEDER EXTENSIONNew or upgraded circuitOn-going2028-10-092027-01-09-639 d
GUSTINE 1103-NEW CIRCUIT OUTLETSubstation UpgradesOn-going2030-01-312028-05-01-640 d
SPENCE 1101 UNDER SOLEDAD #1 T-LINENew or upgraded circuitOn-going2028-07-032026-09-30-642 d
INDUSTRIAL ACRES - 12KV CUTOVERSubstation UpgradesOn-going2028-12-192027-03-02-658 d
ROUGH AND READY 1102 RECONDUCTORINGNew or upgraded circuitOn-going2028-07-312026-09-30-670 d
Install San Bernard Bank 2Substation UpgradesCompleted2026-12-302025-02-06-692 d
SM1107 MAINLINE & RANCHITA CANYON RECONDNew or upgraded circuitOn-going2028-12-202027-01-23-697 d
Coalinga No.1 1105 New Feeder with Bank 2 upgradeSubstation UpgradesCompleted2028-03-292026-04-24-705 d
Templeton Bank 2 Upgrade Distribution Line WorkSubstation UpgradesOn-going2028-12-192027-01-11-708 d
SM1107 MAINLINE & RANCHITA CANYON RECONDNew or upgraded circuitOn-going2028-12-202027-01-12-708 d
SM1107 MAINLINE & RANCHITA CANYON RECONDNew or upgraded circuitOn-going2028-12-282027-01-12-716 d
WHEELER RIDGE 21KV FEEDERS PH IISubstation UpgradesOn-going2030-03-082028-03-20-718 d
Stockton A Bank 5 UpgradeSubstation UpgradesPre-execution2029-12-312028-01-08-722 d
Templeton Bank 2 Upgrade Distribution Line WorkNew or upgraded circuitOn-going2029-03-012027-01-31-760 d
CHARCA INSTALL 1101 DIST. CIRCUITNew or upgraded circuitCompleted2028-07-032026-05-30-765 d
NEW SUBSTATION_WEBER AREA - MARIPOSA RDSubstation UpgradesOn-going2029-02-132026-12-30-776 d
06A - BORONDA 1102 FEEDER REINFORCMENTSubstation UpgradesOn-going2028-10-042026-08-18-778 d
OTTER 1102 BIG SUR RECONNew or upgraded circuitOn-going2028-11-302026-08-15-838 d
OTTER 1102 BIG SUR RECONNew or upgraded circuitOn-going2028-11-302026-08-15-838 d
OTTER 1102 BIG SUR RECONNew or upgraded circuitOn-going2028-11-302026-08-15-838 d
SPENCE 1101 UNDER SOLEDAD #1 T-LINENew or upgraded circuitCompleted2027-08-262025-04-28-850 d
EL CAPITAN -NEW CIRCUIT 2111 OUTLETSubstation UpgradesOn-going2031-08-132029-02-05-919 d
New 30MVA bank-2Substation UpgradesCompleted2027-04-022024-09-16-928 d
REPLACE GARBERVILLE 12KV BUS AND SUB REGNew or upgraded circuitOn-going2030-12-132028-04-27-960 d
MWC 46/06 - New Fairway 1102 FeederNew or upgraded circuitOn-going2030-03-012027-03-04-1,093 d
HARDING: REPL 60/4KV BK 1Substation UpgradesOn-going2029-05-182026-05-02-1,112 d
PASO1108/TEMP2109 UG MAINLINENew or upgraded circuitOn-going2030-04-102027-01-20-1,176 d
STOREY 1102 NEW FEEDERSubstation UpgradesCompleted2029-07-262026-04-17-1,196 d
WHEELER RIDGE 21KV FEEDERS PH IISubstation UpgradesOn-going2029-09-272026-05-29-1,217 d
BANTA: REPL BANK 1Substation UpgradesOn-going2029-07-112026-01-01-1,287 d
LAMMERS NEW 1109 & 1110 FEEDERSSubstation UpgradesOn-going2030-04-032026-01-02-1,552 d
RE-ROUTE FRENCH CAMP FEEDERSNew or upgraded circuitOn-going2030-08-152026-05-05-1,563 d
Reedley bank 3 - bus tie connection upgrade and Reedley 1106 feeder outlet repull to 1100ALNew or upgraded circuitCancelled2023-05-01——
AIRWAYS 1107 TO SANGER 1114 TIENew or upgraded circuitCancelled2026-05-29——
Vierra 1702 - Replace (2) S.B. w/900A OH U.S. switchesNew or upgraded circuitCancelled2024-12-13——
FAMOSO 1102 - LV & PFNew or upgraded circuitPlanned Solution2023-05-30——
BANTA BK 1 - D LINE SEGMENT 1Substation UpgradesPlanned Solution2027-02-02——
SM 1104 RELOCATE R45812 AND INSTALL CAPNew or upgraded circuitCancelled2026-05-28——
46H - Fruitland Bank Replacement workSubstation UpgradesCancelled2024-12-31——
CATLETT 1105: CIRCUIT REINFORCEMENTNew or upgraded circuitCancelled2026-06-04——
ELK CREEK 1101- INSTALL 100A REGNew or upgraded circuitCancelled2020-12-30——
ELK CREEK 1101- INSTALL 100A REGNew or upgraded circuitPlanned Solution2025-04-30——
FIGARDEN 2113 RECONDUCTER 4/0ALNew or upgraded circuitCancelled2026-06-01——
Lerdo 1113 ReconfigurationNew or upgraded circuitCancelled2023-05-30——
TULARE LAKE 1106 RE-CONDUCTORNew or upgraded circuitCancelled2026-10-15——
LOCKEFORD2102 SETS OF 200A VOLTAGE REGSNew or upgraded circuitCancelled2025-05-30——
LOCKEFORD2102 SETS OF 100A VOLTAGE REGSNew or upgraded circuitCancelled2025-06-12——
Reedley Substation_Install 1114 FeederNew or upgraded circuitCancelled2026-05-01——
Reedley Substation_Install 1114 FeederNew or upgraded circuitCancelled2026-05-01——
COALINGA NO. 2 EXPANSIONNew or upgraded circuitPlanned Solution2027-02-18——
New 30MVA bank-2Substation UpgradesCancelled2025-12-31——
Mendota - Install Bank 1New or upgraded circuitPlanned Solution2024-12-30——
Wasco 1102 - Reconductor 6Cu with 397AlNew or upgraded circuitPre-executionN/A2026-05-31—
LE GRAND 1106 RECONDUCTORINGNew or upgraded circuitPlanned Solution2027-08-16——
Replace Chowchilla Bk 2, 16MVA w/45MVA BkNew or upgraded circuitCancelled2028-01-28——
FRENCH CAMP REPLACE BANK 2Substation UpgradesCancelled2028-01-30——
Schindler 1110 OL and PF CorrectionNew or upgraded circuitPre-executionN/A2027-05-03—
WYAN 1109: RPLC SW 5483 & 1505 TO 900USBNew or upgraded circuitPlanned Solution2025-05-30——
Midway 1105 ReconductorNew or upgraded circuitPlanned Solution2025-04-25——
MWC 06H - Live Oak 1104 Reconductor 8700 feet of 2C and 4CNew or upgraded circuitCancelled2024-04-30——
ANITA 1101: INSTALL 200 AMP REGULATORNew or upgraded circuitPlanned Solution2026-06-25——
Chualar Substation: Inst Transf BankSubstation UpgradesPlanned Solution2024-12-31——
PANOCHE 1103 RECONFIGURE TO TRFR LOADNew or upgraded circuitPlanned Solution2027-04-29——
CURTIS 1704 - GREENLEY RD CLOSE UG LOOPNew or upgraded circuitPlanned Solution2026-10-02——
LOCKEFORD SUB_INST BK5 AND TWO 21KV FDRSSubstation UpgradesCancelled2025-03-12——
LOCKEFORD SUB_INST BK5 AND TWO 21KV FDRSSubstation UpgradesCancelled2030-07-24——
RECONDUCTOR ~4,600FT OH - RIPON 1701New or upgraded circuitPlanned Solution2026-06-01——
Cuyama 1104-Install RegNew or upgraded circuitPre-executionN/A2026-09-29—
Fruitvale 1106 ReconductorNew or upgraded circuitPre-executionN/A2027-12-31—
Corning Substation - Install FeederNew or upgraded circuitCancelled2024-12-30——
Corning Substation - Install FeederNew or upgraded circuitCancelled2026-12-31——
OAK PARK - INSTALL NEW BANK AND FEEDERSubstation UpgradesPlanned Solution2027-12-31——
MORMON NEW BK2 & 1-12KV FEEDERSubstation UpgradesCancelled2027-05-28——
MORMON NEW BK2 & 1-12KV FEEDERNew or upgraded circuitCancelled2027-12-31——
CARUTHERS 1105 RECONDUCTORINGNew or upgraded circuitCancelled2023-05-31——
Stockton A 1104 Feeder Outlet ReplacementNew or upgraded circuitPre-executionN/A2027-12-16—
Stockton A 1106 Feeder Outlet ReplacementNew or upgraded circuitPre-executionN/A2027-12-16—
Stockton A Bank 3 12kV Bus UpgradeSubstation UpgradesPre-executionN/A2028-11-01—
Reconductor 397Al with 715Al on Olivehurst 1103New or upgraded circuitPre-executionN/A2028-02-24—
CARBONA 1102 RECONDUCTORNew or upgraded circuitCancelled2024-12-30——
MWC 46/06 Install Storey 1103 CircuitNew or upgraded circuitCancelled2028-11-06——
BUELLTON 1102 MAINLINE TIE UG UPGRADENew or upgraded circuitCancelled2024-06-28——
Smyrna 1102 reconductor- transfer from Smyrna 1106New or upgraded circuitCancelled2028-05-30——
SANTA MARIA 1110 - EOL VOLTAGE SUPPORTNew or upgraded circuitCancelled2023-06-29——
Charca 1102 OL, LV CorrectionNew or upgraded circuitPlanned Solution2023-05-30——
GLENN 1101 RECONDUCTOR 4/0AL TO 715ALNew or upgraded circuitPlanned Solution2025-05-30——
SCHINDLER 1105 RESOLVE OVERLOAD AND LOWNew or upgraded circuitCancelled2026-06-30——
TERMINOUS 1102 FUSE REPLACE WITH LR DUE TO ABNORMAL CONDTIONNew or upgraded circuitCancelled2025-04-30——
R3 SCHINDLER 1112 - RECON, INST 2 CAPSNew or upgraded circuitCancelled2023-12-29——
GATES 1105 OVERLOAD CORRECTIONNew or upgraded circuitPlanned Solution2023-02-24——
GATES 1106 RECONDUCTOR & DEVICE UPGRADESNew or upgraded circuitPlanned Solution2025-05-30——
MCFARLAND 1102 - OL, LV & PFNew or upgraded circuitCancelled2023-05-30——
GOOSE LAKE 2104 - OL, LV & PFNew or upgraded circuitPlanned Solution2026-05-29——
SMYRNA 1105 - OL & LV CORRECTIONNew or upgraded circuitPlanned Solution2026-05-29——
Replace SB 80999 with 900A_SWNew or upgraded circuitCancelled2024-05-31——
DAIRYLAND 1109 RECONDUCTORINGNew or upgraded circuitPlanned Solution2026-05-29——
E.Stockton 1101 RecondutoringNew or upgraded circuitCancelled2024-05-31——
Replace FC Bank1 and install French Camp fdrsSubstation UpgradesCancelled2024-12-30——
Replace FC Bank1 and install French Camp fdrsSubstation UpgradesCancelled2028-01-31——
Replace FC Bank1 and install French Camp fdrsSubstation UpgradesCancelled2031-01-21——
Weber 1110 - Install 1-1200KVAR SCADA CAPNew or upgraded circuitCancelled2027-04-01——
BIOLA 1102 - INSTALL REGULATORNew or upgraded circuitCancelled2025-05-30——
BIOLA 1103 - INSTALL REGULATORSNew or upgraded circuitCancelled2025-05-30——
KERMAN 1106 INSTALL REGULATORSNew or upgraded circuitCancelled2025-05-30——
HOLLISTER 2101 REDUCE CUSTOMER COUNTNew or upgraded circuitCancelled2026-03-30——
EP-ATASCADERO 1101 FUSE 4663 ZONE 3RD PHNew or upgraded circuitCancelled2024-12-14——
STRESSED EQUIPMENT - LOS PADRESNew or upgraded circuitCancelled2025-12-30——
HERDLYN 1102 RECONDUCTOR - BETHANY RDNew or upgraded circuitCancelled2024-12-30——
RECONDUCTOR EL CAMINO REAL (101 HWY)New or upgraded circuitCancelled2025-11-19——
REINFORCE SALINAS 1106 - T&ANew or upgraded circuitCancelled2025-12-30——
Lammers 1102 - Reconductor 2200ft w/1100Al UG CableNew or upgraded circuitPlanned Solution2026-03-25——
Cassidy- Border Coppermine 70kVNew or upgraded circuitCancelled2025-02-07——
Dinuba 1104 - Reconductor 1/0 and 4/0 with 715ALNew or upgraded circuitPlanned Solution2027-05-07——
Goose Lake 1106 - OL & LVNew or upgraded circuitCancelled2026-05-29——
Deficit MW is PG&E own forecast facility gap, not hosting capacity. project_cost_dollark from layer 29 is deliberately not exported: many rows repeat 78,217,571.45 verbatim, which reads as filler rather than a cost.
    PG&E grid needs and project slip — ZoningLabs