Grid needs, and the projects meant to fix them
PG&E publishes what each substation bank will be short through 2040, and — separately — the original and current in-service date of every planned fix. The gap between those two dates is what a developer hanging a project off that substation is actually waiting on.
Snapshot 2026-09-11 · source: services2.arcgis.com/mJaJSax0KPHoCNB6/arcgis/rest/services/DRPComplianceRelProd/FeatureServer/28, services2.arcgis.com/mJaJSax0KPHoCNB6/arcgis/rest/services/DRPComplianceRelProd/FeatureServer/30, services2.arcgis.com/mJaJSax0KPHoCNB6/arcgis/rest/services/DRPComplianceRelProd/FeatureServer/29 · 360 rows · plus 4,457 GNA needs · utility last wrote 2026-09-11
Substation bank deficit, 2026–2040
Summed across 1,258 banks. Bank level only — feeders roll up into banks, and charting both would count the same gap twice.
152 banks are short in 2026; by 2040 that is 532.
What is driving the need
Primary driver, where PG&E states one.
- Demand Growth1,392
- In-flight project near completion13
- Non-strategic hour overload13
- Completing LOOP (or) BACK TIE12
- Long-term overload12
- Feeder > 600 Amps Project, Completing LOOP (or) BACK TIE, Emergency Bank Loss Project10
- Feeder > 600 Amps Project, Long-term overload, Completing LOOP (or) BACK TIE9
- In-flight project near completion, Completing LOOP (or) BACK TIE9
Banks with the largest 2040 gap
Top 25 by forecast deficit.
| Substation | Bank | Division | Driver | Need by | 2030 (MW) | 2040 (MW) |
|---|---|---|---|---|---|---|
| NEWARK | NEWARK BANK 21 | Mission | Demand Growth | 2026 | 15.9 | 112.1 |
| SANTA TERESA NEW ( (2021) | SANTA TERESA NEW BANK 1( (2021) | San Jose | Demand Growth | 2027 | 31.4 | 108.3 |
| MT EDEN | MT EDEN BANK 2 | Mission | Demand Growth | 2028 | 6.8 | 104.7 |
| EAST GRAND | EAST GRAND BANK 4 | Peninsula | Demand Growth | 2027 | 45.1 | 101.7 |
| EDES | EDES BANK 3 | East Bay | Demand Growth | 2028 | 19.4 | 93.9 |
| STONE | STONE BANK 2 | San Jose | Demand Growth | 2028 | 17.0 | 66.1 |
| MT EDEN | MT EDEN BANK 1 | Mission | Demand Growth | 2029 | 1.8 | 66.0 |
| HICKS | HICKS BANK 1 | San Jose | Demand Growth | 2026 | 21.3 | 58.1 |
| MONTAGUE | MONTAGUE BANK 2 | San Jose | Demand Growth | 2026 | 16.1 | 50.2 |
| TRIMBLE | TRIMBLE BANK 3 | San Jose | Demand Growth | 2027 | 11.8 | 47.0 |
| HICKS | HICKS BANK 2 | San Jose | Demand Growth | 2026 | 15.7 | 46.5 |
| PIERCY | PIERCY BANK 3 | San Jose | Demand Growth | 2026 | 10.2 | 44.8 |
| LAS POSITAS | LAS POSITAS BANK 2 | Mission | Demand Growth | 2027 | 13.8 | 44.8 |
| SARATOGA | SARATOGA BANK 2 | De Anza | Demand Growth | 2026 | 13.4 | 44.4 |
| TIDEWATER | TIDEWATER BANK 1 | Diablo | Demand Growth | 2032 | 0.0 | 43.8 |
| MEADOW LANE | MEADOW LANE BANK 3 | Diablo | Demand Growth | 2031 | 0.0 | 43.2 |
| MONTAGUE | MONTAGUE BANK 3 | San Jose | Demand Growth | 2030 | 2.1 | 42.8 |
| SAN RAMON | SAN RAMON BANK 4 | Mission | Demand Growth | 2027 | 15.6 | 42.6 |
| SARATOGA | SARATOGA BANK 3 | De Anza | Demand Growth | 2026 | 16.6 | 40.1 |
| EDENVALE | EDENVALE BANK 2 | San Jose | Demand Growth | 2026 | 6.6 | 39.3 |
| VINEYARD | VINEYARD BANK 2 | Mission | Demand Growth | 2026 | 14.5 | 38.9 |
| PAUL SWEET | PAUL SWEET BANK 2 | Central Coast | Demand Growth | 2032 | 0.0 | 38.3 |
| SALINAS | SALINAS BANK 6 | Central Coast | Demand Growth | 2028 | 4.7 | 37.8 |
| MILPITAS | MILPITAS BANK 2 | San Jose | Demand Growth | 2026 | 17.2 | 37.6 |
| WHISMAN | WHISMAN BANK 2 | De Anza | Demand Growth | 2027 | 0.0 | 37.3 |
Planned projects, worst slip first
All 360 rows. "Slip" is the current expected in-service date minus the original — PG&E publishes both, so this much is visible today; how the current date moves month to month is what only an archive can show.
| Project | Type | Status | Original ISD | Current ISD | Slip |
|---|---|---|---|---|---|
| Install Terminous Bank 2 and 2 new feeders | Substation Upgrades | Pre-execution | 2024-07-01 | 2032-05-01 | +2,861 d |
| Tracy 4kV Cutover | New or upgraded circuit | Pre-execution | 2024-12-30 | 2031-09-01 | +2,436 d |
| Gabilan - Install Bank 2 | Substation Upgrades | Pre-execution | 2024-12-31 | 2030-06-01 | +1,978 d |
| BACKTIE - GONZALES 1102 | New or upgraded circuit | On-going | 2022-10-30 | 2027-12-04 | +1,861 d |
| GLENN 1101 - RECONDUCTOR 2CU W/ 397 AL | New or upgraded circuit | On-going | 2022-11-30 | 2027-12-31 | +1,857 d |
| New Caruthers 1106 Feeder | New or upgraded circuit | Pre-execution | 2024-12-31 | 2029-11-01 | +1,766 d |
| LE GRAND 1110 RECONDUCTORING | New or upgraded circuit | Pre-execution | 2023-12-28 | 2028-05-01 | +1,586 d |
| Chualar Substation: Inst Transf Bank | Substation Upgrades | Pre-execution | 2024-12-31 | 2029-03-02 | +1,522 d |
| New Caruthers 1106 Feeder | New or upgraded circuit | Pre-execution | 2025-09-22 | 2029-11-02 | +1,502 d |
| SISQUOC 1102 - INSTALL 2 CAP BANKS | Substation Upgrades | Pre-execution | 2024-12-30 | 2028-12-31 | +1,462 d |
| Buellton - Replace Bank 1 with 45MVA Bank and add new 1103 feeder | Substation Upgrades | Pre-execution | 2026-06-30 | 2030-06-01 | +1,432 d |
| Buellton - Replace Bank 1 with 45MVA Bank and add new 1103 feeder | Substation Upgrades | Pre-execution | 2026-12-30 | 2030-06-01 | +1,249 d |
| JOHNSON CANYON SUB - LAND PURCHASE | Substation Upgrades | Pre-execution | 2027-12-31 | 2030-12-31 | +1,097 d |
| TULARE LAKE SUB - INSTALL 1105 FEEDER | New or upgraded circuit | On-going | 2027-10-04 | 2030-07-05 | +1,005 d |
| SAN JOAQUIN SUB: NEW BK 2, 1113 FDR | Substation Upgrades | On-going | 2026-11-27 | 2029-05-02 | +887 d |
| HENRIETTA 1110 OL AND LV CORRECTION | New or upgraded circuit | Pre-execution | 2026-04-30 | 2028-06-01 | +763 d |
| 06D - MESA 1101 - REG R542 UPGRADE | New or upgraded circuit | Pre-execution | 2026-05-28 | 2028-06-01 | +735 d |
| Mendota - Install Bank 1 | New or upgraded circuit | Pre-execution | 2024-12-30 | 2027-01-01 | +732 d |
| SHAFTER 1103 DIST LINE AND RECONDUCTOR | New or upgraded circuit | Pre-execution | 2026-06-23 | 2028-06-01 | +709 d |
| CHOWCHILLA 1104 RECONDUCTOR | New or upgraded circuit | Pre-execution | 2026-03-31 | 2027-12-31 | +640 d |
| CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4 | New or upgraded circuit | On-going | 2025-02-07 | 2026-09-30 | +600 d |
| HOLLISTER 2105 CUTOVER AND AUTOTX INST | New or upgraded circuit | On-going | 2024-12-30 | 2026-08-17 | +595 d |
| INSTALL 2 CAP BKS - SANTA NELLA 1104 | New or upgraded circuit | Pre-execution | 2025-09-04 | 2027-04-15 | +588 d |
| REPLACE 557058 ON DAIRYLAND 1102 | New or upgraded circuit | Pre-execution | 2026-05-31 | 2027-12-31 | +579 d |
| DLINE RECOND LOS OSITOS 2103 BCKTIE- PT3 | New or upgraded circuit | Pre-execution | 2025-08-29 | 2026-11-16 | +444 d |
| REEDLEY DPA - REPLACE OVERLOADED REGS | New or upgraded circuit | On-going | 2025-11-10 | 2027-01-15 | +431 d |
| LAMMERS NEW 1109 & 1110 FEEDERS | Substation Upgrades | On-going | 2027-03-01 | 2028-05-01 | +427 d |
| 35566024 _SANTA NELLA 1600' OH CONDUCTOR | New or upgraded circuit | On-going | 2026-03-17 | 2027-05-05 | +414 d |
| SHEPHERD - INSTALL 2108 DIST WORK | Substation Upgrades | Pre-execution | 2026-12-01 | 2028-01-02 | +397 d |
| SHEPHERD - INSTALL 2108 DIST WORK | Substation Upgrades | Pre-execution | 2026-12-01 | 2028-01-01 | +396 d |
| RECONDUCTOR FOLETTA RD -GONZALES 1104 | New or upgraded circuit | On-going | 2026-07-23 | 2027-08-23 | +396 d |
| DEL MONTE 2104 & R.R.1101 CKT REINFRCMNT | New or upgraded circuit | On-going | 2026-06-10 | 2027-07-07 | +392 d |
| OH RECONDUCTOR HOL 2105 FAIRVIEW RD | New or upgraded circuit | On-going | 2025-09-26 | 2026-10-16 | +385 d |
| KINGSBURG 1113 - RECONDUCTORING 6C | New or upgraded circuit | Pre-execution | 2026-07-13 | 2027-07-13 | +365 d |
| LAMONT 1106 RECONDUCTOR | New or upgraded circuit | Pre-execution | 2027-05-19 | 2028-05-16 | +363 d |
| MAGUNDEN 1105 OL CONDUCTOR | New or upgraded circuit | On-going | 2027-02-26 | 2027-12-22 | +299 d |
| KERMAN 1103 - RECONDUCTOR | New or upgraded circuit | On-going | 2026-08-21 | 2027-06-01 | +284 d |
| HERDLYN 1102 RECONDUCTOR - BETHANY RD | New or upgraded circuit | On-going | 2027-08-27 | 2028-05-02 | +249 d |
| REINFORCE KC 1101 & 1103 | New or upgraded circuit | On-going | 2026-04-07 | 2026-12-02 | +239 d |
| STOREY 1108 OH DISCONNECT REPLACEMENT | New or upgraded circuit | Pre-execution | 2025-09-02 | 2026-04-27 | +237 d |
| WAHTOKE 1107 - CREATE A BACK TIE | New or upgraded circuit | On-going | 2026-04-27 | 2026-12-11 | +228 d |
| COALINGA NO 1 1108 RECON FOR NB | New or upgraded circuit | On-going | 2026-05-22 | 2026-12-15 | +207 d |
| CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4 | New or upgraded circuit | On-going | 2027-04-19 | 2027-10-29 | +193 d |
| McCall 1103 Reconductoring 2nd Phase | New or upgraded circuit | Pre-execution | 2026-04-13 | 2026-10-22 | +192 d |
| MIDWAY SUB: REPLACE BANK 8 | Substation Upgrades | On-going | 2027-06-29 | 2028-01-01 | +186 d |
| REPLACE LR 6502 - CLARKSVILLE 2109 | New or upgraded circuit | Pre-execution | 2026-12-16 | 2027-06-15 | +181 d |
| MAGUNDEN2108-2109 | New or upgraded circuit | On-going | 2027-01-04 | 2027-06-29 | +176 d |
| NEW VIERRA 1708 FEEDER | Substation Upgrades | On-going | 2028-03-29 | 2028-09-05 | +160 d |
| Borden 1102 Bank Repl & Equipment | Substation Upgrades | Pre-execution | 2027-12-31 | 2028-06-01 | +153 d |
| EL NIDO 1101 RECONDUCTOR | New or upgraded circuit | On-going | 2026-10-29 | 2027-03-25 | +147 d |
| MIDWAY 1101 AND MIDWAY 1103 RECONDUCTOR | New or upgraded circuit | Pre-execution | 2026-02-19 | 2026-07-12 | +143 d |
| MOMENTUM SUBSTATION:DIST FDR WO (2027) | Substation Upgrades | On-going | 2027-08-02 | 2027-12-21 | +141 d |
| DLINE RECOND LOS OSITOS 2103 BCKTIE- PT3 | New or upgraded circuit | On-going | 2026-10-19 | 2027-03-03 | +135 d |
| CORNING 1103 RECONDUCTOR 6200 FT W/715A | New or upgraded circuit | Pre-execution | 2028-06-01 | 2028-10-11 | +132 d |
| NEW FEEDERS AT COLUMBUS | New or upgraded circuit | On-going | 2028-07-24 | 2028-12-01 | +130 d |
| AUBERRY 1101 INSTALL VOLTAGE REGULATOR | New or upgraded circuit | On-going | 2026-09-16 | 2026-12-30 | +105 d |
| PEORIA 1704 RECONDUCTOR, CAPS, REGS | New or upgraded circuit | On-going | 2027-08-02 | 2027-11-05 | +95 d |
| BLACKWELL 2101 INSTALL BACK-TIE_06H | New or upgraded circuit | On-going | 2027-04-30 | 2027-07-03 | +64 d |
| ESQUON 1102: INSTALL CLSE DLTA REGULATOR | New or upgraded circuit | On-going | 2026-03-20 | 2026-05-01 | +42 d |
| LAKEVIEW: INSTALL 1108 FEEDER | New or upgraded circuit | On-going | 2026-10-21 | 2026-11-30 | +40 d |
| EL CAPITAN -NEW CIRCUIT 2111 OUTLET | Substation Upgrades | Pre-execution | 2028-12-29 | 2029-02-06 | +39 d |
| New Vierra 1704 Feeder | New or upgraded circuit | On-going | 2026-09-11 | 2026-10-16 | +35 d |
| EIGHT MILE 2106 FEEDER EXTENSION PH 1 | New or upgraded circuit | On-going | 2027-07-28 | 2027-08-30 | +33 d |
| FOOTHILL BANK 1 UPGRADE-DIST WORK | Substation Upgrades | On-going | 2028-05-03 | 2028-06-01 | +29 d |
| EIGHT MILE 2106 FEEDER EXTENSION PH 1 | New or upgraded circuit | On-going | 2027-07-30 | 2027-08-25 | +26 d |
| Install San Bernard Bank 2 | Substation Upgrades | On-going | 2026-10-30 | 2026-11-23 | +24 d |
| SUMMIT 1102 MAINLINE RECONDUCTOR | New or upgraded circuit | On-going | 2026-11-04 | 2026-11-17 | +13 d |
| CHARCA INSTALL 1101 DIST. CIRCUIT | New or upgraded circuit | On-going | 2026-08-31 | 2026-09-11 | +11 d |
| Borden 1102 Bank Repl & Equipment | Substation Upgrades | On-going | 2029-02-21 | 2029-03-02 | +9 d |
| Tracy 4kV Cutover | New or upgraded circuit | On-going | 2027-06-30 | 2027-07-08 | +8 d |
| Buellton 1101 - Install 100A regulator | New or upgraded circuit | Pre-execution | 2026-04-23 | 2026-05-01 | +8 d |
| COTTONWOOD 1103 RECONDUCTOR | New or upgraded circuit | Completed | 2026-06-05 | 2026-06-09 | +4 d |
| WEBER_REPL_BANK 4_DIST SUB | Substation Upgrades | Completed | 2026-05-26 | 2026-05-29 | +3 d |
| SOUTH FRESNO OVERLOAD RELIEF T LIINE | New or upgraded circuit | On-going | 2026-04-30 | 2026-05-03 | +3 d |
| WAHTOKE SUB - INSTALL 1102 FEEDER | New or upgraded circuit | Pre-execution | 2029-09-28 | 2029-09-30 | +2 d |
| STOREY 1101 NEW FEEDER | New or upgraded circuit | Completed | 2026-04-15 | 2026-04-17 | +2 d |
| WHEELER RIDGE 21KV FEEDERS PH II | Substation Upgrades | Completed | 2025-10-30 | 2025-10-31 | +1 d |
| INSTALL NEW OH SW - FIREBAUGH 1101 | New or upgraded circuit | Pre-execution | 2026-03-26 | 2026-03-27 | +1 d |
| LEMOORE 1101 520' OF 6 CU REPL W/ 397AL | New or upgraded circuit | Completed | 2025-12-24 | 2025-12-25 | +1 d |
| RE-ROUTE FRENCH CAMP FEEDERS | Substation Upgrades | Pre-execution | 2030-05-31 | 2030-06-01 | +1 d |
| STAGG 1101 LR 9212 OVERLOAD RPL | New or upgraded circuit | Completed | 2026-05-05 | 2026-05-05 | 0 d |
| PANOCHE SUB: INSTALL 21V BANK | Substation Upgrades | On-going | 2026-11-16 | 2026-11-16 | 0 d |
| FRENCH CAMP BACKTIE | New or upgraded circuit | Completed | 2026-03-30 | 2026-03-30 | 0 d |
| CARBONA 1104 RECOND W/397AL | New or upgraded circuit | On-going | 2026-12-29 | 2026-12-29 | 0 d |
| *WHEELER RIDGE 1101 REPLACE OH FUSES | New or upgraded circuit | Completed | 2025-10-05 | 2025-10-05 | 0 d |
| VIERRA 1706 I-5 RECONDUCTORING | New or upgraded circuit | Completed | 2026-04-26 | 2026-04-26 | 0 d |
| GATES 1102 RECONDUCTOR | New or upgraded circuit | Completed | 2025-12-19 | 2025-12-19 | 0 d |
| GANSO 1104 OL AND LOW VOLTAGE | New or upgraded circuit | Completed | 2026-07-08 | 2026-07-08 | 0 d |
| RECON 3500' TEMPLETON 2019, UNION RD. PR | New or upgraded circuit | Completed | 2026-07-01 | 2026-07-01 | 0 d |
| INSTALL NEW REGULATOR - LOS OSITOS 2103 | New or upgraded circuit | Completed | 2025-12-04 | 2025-12-04 | 0 d |
| INSTALL NEW OH SW - MENDOTA 1103 | New or upgraded circuit | Pre-execution | 2026-03-27 | 2026-03-26 | -1 d |
| COTTONWOOD 1103 RECONDUCTOR | New or upgraded circuit | Completed | 2026-04-24 | 2026-04-23 | -1 d |
| SOUTH FRESNO OVERLOAD RELIEF T LIINE | New or upgraded circuit | Completed | 2026-05-07 | 2026-05-06 | -1 d |
| EP-OCE 1106 NB RECOND HIGHLAND,OCEANO | New or upgraded circuit | Completed | 2025-11-14 | 2025-11-13 | -1 d |
| LINCOLN 1101-CAPACITY | New or upgraded circuit | On-going | 2026-12-31 | 2026-12-29 | -2 d |
| WEBER_REPL_BANK 4_DIST SUB | New or upgraded circuit | Completed | 2026-05-26 | 2026-05-23 | -3 d |
| LAKEVIEW 1103 RECONDUCTOR | New or upgraded circuit | On-going | 2026-08-10 | 2026-08-07 | -3 d |
| Airways Install Switchgear 3 | New or upgraded circuit | On-going | 2026-06-26 | 2026-06-23 | -3 d |
| Install Madera 1110 Feeder | New or upgraded circuit | Completed | 2026-01-14 | 2026-01-10 | -4 d |
| Coalinga No.1 1105 New Feeder with Bank 2 upgrade | Substation Upgrades | On-going | 2026-08-14 | 2026-08-10 | -4 d |
| New Airways Bank 3 and New Airway 1110 | Substation Upgrades | On-going | 2026-06-29 | 2026-06-23 | -6 d |
| EIGHT MILE 2106 FEEDER EXTENSION PH 1 | New or upgraded circuit | On-going | 2027-08-31 | 2027-08-24 | -7 d |
| DIVIDE 1102 RECON (UNION AVE/PINAL AVE) | New or upgraded circuit | On-going | 2026-12-30 | 2026-12-23 | -7 d |
| PANAMA 2101 21KV ML EXTENSION AND BACKTI | New or upgraded circuit | On-going | 2027-01-04 | 2026-12-24 | -11 d |
| SLO 1107 UG SRC | New or upgraded circuit | On-going | 2026-12-30 | 2026-12-17 | -13 d |
| NEW SAN MIGUEL BK 3 SM 2106 FDR(TLINE | Substation Upgrades | On-going | 2027-07-30 | 2027-07-16 | -14 d |
| CARUTHERS 1102 RECONDUCTORING | New or upgraded circuit | On-going | 2026-08-21 | 2026-08-07 | -14 d |
| PENRYN 1106 RECONDUCTORING | New or upgraded circuit | On-going | 2027-12-30 | 2027-12-15 | -15 d |
| ROCKLIN 1102 - PH1 | New or upgraded circuit | Completed | 2026-07-16 | 2026-06-30 | -16 d |
| BANTA: REPL BANK 1 | Substation Upgrades | Completed | 2026-02-27 | 2026-02-11 | -16 d |
| CALFLAX BANK 2 D-WORK - PHASE II | New or upgraded circuit | On-going | 2026-09-22 | 2026-09-04 | -18 d |
| WASCO 1104 RECONDUCTOR | New or upgraded circuit | On-going | 2026-10-21 | 2026-09-30 | -21 d |
| ROCKLIN 1102 - PH1 | New or upgraded circuit | Completed | 2026-07-30 | 2026-07-09 | -21 d |
| MONTEREY - NEW 21KV FEEDERS | New or upgraded circuit | Completed | 2026-05-30 | 2026-05-05 | -25 d |
| MWC 46/06 - New Fairway 1102 Feeder | New or upgraded circuit | On-going | 2027-12-13 | 2027-11-17 | -26 d |
| EL Nido 1101 Reconductoring | New or upgraded circuit | On-going | 2027-06-25 | 2027-05-28 | -28 d |
| ORO FINO 1102 - RECONDUCTOR TIER 3 HFTD | New or upgraded circuit | On-going | 2026-06-29 | 2026-06-01 | -28 d |
| Install Madera 1110 Feeder | New or upgraded circuit | Completed | 2026-05-20 | 2026-04-22 | -28 d |
| STOCKDALE 2113 1100CU RECONDUCTOR | New or upgraded circuit | Pre-execution | 2028-06-30 | 2028-06-01 | -29 d |
| Reedley 1106 feeder outlet recondcutor | New or upgraded circuit | On-going | 2027-02-19 | 2027-01-15 | -35 d |
| ED-FUTURE PR 1103 - INSTALL 2 CAPACITOR | New or upgraded circuit | Completed | 2026-01-22 | 2025-12-16 | -37 d |
| CURTIS 1703 RECONDUCTOR WORK_PH1 | New or upgraded circuit | Pre-execution | 2027-07-06 | 2027-05-27 | -40 d |
| LOS OSITOS 2103 MAINLINE STEPDOWN - PT2 | New or upgraded circuit | Completed | 2026-07-20 | 2026-05-29 | -52 d |
| DLINE RECOND LOS OSITOS 2103 BCKTIE- PT3 | New or upgraded circuit | On-going | 2027-01-06 | 2026-11-13 | -54 d |
| LERDO 1116 RECONDUCTOR | New or upgraded circuit | Pre-execution | 2026-02-25 | 2026-01-01 | -55 d |
| Airways Install Switchgear 3 | Substation Upgrades | On-going | 2028-07-28 | 2028-06-01 | -57 d |
| BUENA VISTA 1106 CIRCUIT REINFORCEMENT | New or upgraded circuit | On-going | 2027-04-29 | 2027-03-03 | -57 d |
| BANTA BK 1 - D LINE SEGMENT 1 | Substation Upgrades | Completed | 2026-01-21 | 2025-11-14 | -68 d |
| TP2110_RECONDUCTOR WILLOW CREEK RD | New or upgraded circuit | On-going | 2027-03-30 | 2027-01-19 | -70 d |
| CORNING 1101 RECOND FEEDER OUTLET | New or upgraded circuit | Completed | 2026-07-26 | 2026-05-10 | -77 d |
| Castroville 2103 - Backtie Reinforcement | New or upgraded circuit | On-going | 2027-03-09 | 2026-12-17 | -82 d |
| OLD RIVER INSTALL 1106 DIST. CIRCUIT | New or upgraded circuit | On-going | 2026-12-31 | 2026-10-08 | -84 d |
| BANTA BK 1 - D LINE SEGMENT 1 | Substation Upgrades | On-going | 2027-05-24 | 2027-02-24 | -89 d |
| CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4 | New or upgraded circuit | On-going | 2026-12-28 | 2026-09-30 | -89 d |
| RISING RIVER RECONDUCTOR 4300 FT (2026) | New or upgraded circuit | On-going | 2026-12-30 | 2026-10-01 | -90 d |
| EIGHT MILE 2106 FEEDER EXTENSION PH 1 | New or upgraded circuit | On-going | 2027-08-27 | 2027-05-28 | -91 d |
| Tracy 4kV Cutover | New or upgraded circuit | On-going | 2027-04-30 | 2027-01-29 | -91 d |
| INSTALL 7TH STANDARD 2106 FEEDER | Substation Upgrades | On-going | 2027-08-23 | 2027-05-21 | -94 d |
| SPENCE 1101 UNDER SOLEDAD #1 T-LINE | New or upgraded circuit | On-going | 2027-01-04 | 2026-09-30 | -96 d |
| Replace Weber BK3 and install Weber 1117 | New or upgraded circuit | Completed | 2026-04-14 | 2026-01-08 | -96 d |
| SAN BERNARD 1101- RECONDUCTOR 4CU | New or upgraded circuit | On-going | 2027-05-27 | 2027-02-05 | -111 d |
| Lakeview 1108 Repl T Poles | New or upgraded circuit | On-going | 2026-10-21 | 2026-06-30 | -113 d |
| WRIGHT 1110 OFFLOAD | New or upgraded circuit | Completed | 2026-03-02 | 2025-10-30 | -123 d |
| CRESCENT SW STA-SCHINDLER - RPL PL | New or upgraded circuit | On-going | 2026-09-26 | 2026-05-26 | -123 d |
| CHARCA INSTALL 1101 DIST. CIRCUIT | New or upgraded circuit | On-going | 2028-10-06 | 2028-06-01 | -127 d |
| SAND CREEK 1103 RECONDUCTOR - SEGMENT 3 | New or upgraded circuit | Paused | 2028-12-29 | 2028-08-23 | -128 d |
| CRESCENT SW STA-SCHINDLER - RPL PL | New or upgraded circuit | Completed | 2026-10-03 | 2026-05-25 | -131 d |
| CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4 | New or upgraded circuit | On-going | 2026-12-31 | 2026-08-20 | -133 d |
| NEW VIERRA 1708 FEEDER | Substation Upgrades | On-going | 2029-01-17 | 2028-09-04 | -135 d |
| BANTA BK 1 - D LINE SEGMENT 1 | Substation Upgrades | On-going | 2028-04-28 | 2027-12-10 | -140 d |
| EP-ATASCADERO 1103-REROUTE MAINLINE | New or upgraded circuit | On-going | 2027-01-30 | 2026-09-11 | -141 d |
| MWC 46/06 Install Storey 1103 Circuit | New or upgraded circuit | Completed | 2026-04-30 | 2025-12-09 | -142 d |
| SAN JOAQUIN SUB: NEW BK 2, 1113 FDR | Substation Upgrades | On-going | 2029-09-26 | 2029-05-02 | -147 d |
| MIDWAY SUB: REPLACE BANK 8 | Substation Upgrades | On-going | 2026-12-29 | 2026-07-31 | -151 d |
| RECONDUCTOR EL CAMINO REAL (101 HWY) | New or upgraded circuit | On-going | 2027-08-06 | 2027-03-03 | -156 d |
| WEBER - INSTALL FEEDER 1112 | New or upgraded circuit | On-going | 2028-04-03 | 2027-10-29 | -157 d |
| EIGHT MILE 2106 FEEDER EXTENSION PH 1 | New or upgraded circuit | On-going | 2027-12-06 | 2027-06-25 | -164 d |
| NEW FEEDERS AT COLUMBUS | New or upgraded circuit | On-going | 2029-05-17 | 2028-12-02 | -166 d |
| REINFORCE KC 1101 & 1103 | New or upgraded circuit | On-going | 2027-06-29 | 2027-01-12 | -168 d |
| ROCKLIN 1102 - PH1 | New or upgraded circuit | Completed | 2026-12-07 | 2026-06-11 | -179 d |
| COALINGA #1: REPLACE BANK 2 | Substation Upgrades | On-going | 2026-10-30 | 2026-04-24 | -189 d |
| NEW VIERRA 1708 FEEDER | New or upgraded circuit | Pre-execution | 2029-03-16 | 2028-09-05 | -192 d |
| REINFORCE CASTROVILLE 2103 | New or upgraded circuit | Completed | 2026-03-27 | 2025-09-15 | -193 d |
| New 30MVA bank-2 | Substation Upgrades | On-going | 2027-04-30 | 2026-10-15 | -197 d |
| CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4 | New or upgraded circuit | On-going | 2027-04-19 | 2026-09-30 | -201 d |
| INSTALL NEW RIPON 1705 FEEDER | New or upgraded circuit | On-going | 2027-07-02 | 2026-12-04 | -210 d |
| AUD-ATEJON 12 AND 21 KV LINE WK PKGE #1 | Substation Upgrades | On-going | 2026-12-31 | 2026-06-03 | -211 d |
| WEST FRESNO SUB - INSTALL 1114 FEEDER | New or upgraded circuit | On-going | 2027-11-29 | 2027-05-01 | -212 d |
| Replace Weber BK3 and install Weber 1117 | New or upgraded circuit | Completed | 2025-12-01 | 2025-05-03 | -212 d |
| WEST FRESNO SUB - INSTALL 1113 FEEDER | New or upgraded circuit | On-going | 2027-12-02 | 2027-05-01 | -215 d |
| CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4 | New or upgraded circuit | On-going | 2027-12-31 | 2027-05-25 | -220 d |
| Install San Bernard Bank 2 | Substation Upgrades | Completed | 2025-07-31 | 2024-12-20 | -223 d |
| INSTALL 7TH STANDARD 2106 FEEDER | Substation Upgrades | On-going | 2026-12-01 | 2026-04-22 | -223 d |
| INSTALL 7TH STANDARD 2106 FEEDER | Substation Upgrades | On-going | 2026-11-13 | 2026-03-31 | -227 d |
| CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4 | New or upgraded circuit | On-going | 2027-05-20 | 2026-09-30 | -232 d |
| Shady Glen - Replace Bus | Substation Upgrades | Pre-execution | 2027-12-31 | 2027-05-10 | -235 d |
| KERN OIL 1107-1108 KERN IGP | New or upgraded circuit | On-going | 2028-08-24 | 2028-01-01 | -236 d |
| GUSTINE 1103-NEW CIRCUIT OUTLET | Substation Upgrades | Pre-execution | 2028-12-29 | 2028-05-02 | -241 d |
| STOREY 1101 NEW FEEDER | New or upgraded circuit | On-going | 2026-12-29 | 2026-04-30 | -243 d |
| Westpark1107 Overload | New or upgraded circuit | On-going | 2026-12-01 | 2026-04-01 | -244 d |
| AUD-ATEJON 12 AND 21 KV LINE WK PKGE #1 | New or upgraded circuit | On-going | 2027-09-29 | 2027-01-01 | -271 d |
| TUPMAN 1107 1108 FEEDER DIST WORK | New or upgraded circuit | Completed | 2026-08-28 | 2025-11-26 | -275 d |
| New Airways Bank 3 and New Airway 1110 | Substation Upgrades | Completed | 2027-03-29 | 2026-06-24 | -278 d |
| TUPMAN 1104 - 12% OL ON 6C, RECOND TO 6C | New or upgraded circuit | Pre-execution | 2026-10-23 | 2026-01-01 | -295 d |
| INDUSTRIAL ACRES - 12KV CUTOVER | Substation Upgrades | On-going | 2027-09-28 | 2026-12-07 | -295 d |
| 35253101 Oro Loma 1106 Reconductor Transfer | New or upgraded circuit | Completed | 2025-11-23 | 2025-01-31 | -296 d |
| MALAGA SUB - RECONDUCTOR OUTLETS | New or upgraded circuit | On-going | 2027-11-10 | 2027-01-15 | -299 d |
| PANOCHE SUB: INSTALL 21V BANK | Substation Upgrades | On-going | 2027-02-26 | 2026-05-01 | -301 d |
| CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4 | New or upgraded circuit | On-going | 2027-11-30 | 2027-01-26 | -308 d |
| SPENCE 1101 UNDER SOLEDAD #1 T-LINE | New or upgraded circuit | On-going | 2027-08-31 | 2026-10-24 | -311 d |
| INSTALL NEW ORTIGA 1101 & 1102 CIRCUITS | Substation Upgrades | On-going | 2027-11-30 | 2027-01-20 | -314 d |
| SPENCE 1101 UNDER SOLEDAD #1 T-LINE | New or upgraded circuit | On-going | 2027-10-01 | 2026-11-21 | -314 d |
| WEBER_REPL_BANK 4_DIST SUB | New or upgraded circuit | Completed | 2027-04-20 | 2026-06-01 | -323 d |
| REINFORCE SALINAS 1106 - T&A | New or upgraded circuit | On-going | 2028-01-21 | 2027-03-03 | -324 d |
| 06 - Extending New Lamont 1108 Feeder | New or upgraded circuit | Pre-execution | 2029-03-23 | 2028-05-01 | -326 d |
| NEW SAN MIGUEL BK 3 SM 2106 FDR(TLINE | Substation Upgrades | On-going | 2028-07-18 | 2027-08-10 | -343 d |
| New Feeders Goose Lake Substation | New or upgraded circuit | On-going | 2028-05-09 | 2027-05-31 | -344 d |
| RECONDUCTOR RIVER ROAD - R.R. 1102 | New or upgraded circuit | On-going | 2028-02-10 | 2027-03-03 | -344 d |
| AUD-ATEJON 12 AND 21 KV LINE WK PKGE #1 | Substation Upgrades | On-going | 2027-12-23 | 2027-01-01 | -356 d |
| Santa Nella 1101 Reconductoring and New Equipment | New or upgraded circuit | Completed | 2026-12-14 | 2025-12-19 | -360 d |
| Install Cassidy Bank 1 and 2109 Feeder | New or upgraded circuit | Pre-execution | 2028-12-29 | 2028-01-02 | -362 d |
| FAMOSO 1101 - RECONDUCTOR | New or upgraded circuit | Pre-execution | 2027-05-28 | 2026-05-31 | -362 d |
| WEEDPATCH 1106 CIRCUIT UPGRADE | New or upgraded circuit | Pre-execution | 2027-04-30 | 2026-05-01 | -364 d |
| Install Cassidy Bank 1 and 2109 Feeder | Substation Upgrades | Pre-execution | 2028-12-31 | 2028-01-01 | -365 d |
| ADD 3 CAPACITOR ON KING CITY 1106 F | New or upgraded circuit | Completed | 2027-06-28 | 2026-06-26 | -367 d |
| Replace Weber BK3 and install Weber 1117 | New or upgraded circuit | Completed | 2026-06-11 | 2025-06-04 | -372 d |
| CASSIDY 2107 & 2108 12/21KV CUTOVER PH 4 | New or upgraded circuit | On-going | 2027-10-11 | 2026-09-30 | -376 d |
| EL NIDO 1104 RECONDUCTOR | New or upgraded circuit | Completed | 2027-04-30 | 2026-03-30 | -396 d |
| INSTALL NEW ORTIGA 1101 & 1102 CIRCUITS | Substation Upgrades | On-going | 2027-10-13 | 2026-09-11 | -397 d |
| AIRWAYS 1107 OH RECONDUCTOR | New or upgraded circuit | On-going | 2026-06-05 | 2025-05-04 | -397 d |
| OTTER 1102 BIG SUR RECON | New or upgraded circuit | On-going | 2028-11-30 | 2027-10-29 | -398 d |
| OTTER 1102 BIG SUR RECON | New or upgraded circuit | On-going | 2028-11-30 | 2027-10-29 | -398 d |
| OTTER 1102 BIG SUR RECON | New or upgraded circuit | On-going | 2028-11-30 | 2027-10-29 | -398 d |
| New Feeders Goose Lake Substation | New or upgraded circuit | On-going | 2028-01-07 | 2026-11-30 | -403 d |
| NEW SAN MIGUEL BK 3 SM 2106 FDR(TLINE | Substation Upgrades | On-going | 2027-02-12 | 2026-01-02 | -405 d |
| RECONDUCTOR EL CAMINO REAL (101 HWY) | New or upgraded circuit | On-going | 2028-08-11 | 2027-06-30 | -408 d |
| COTTONWOOD INSTALL NEW FEEDER | New or upgraded circuit | On-going | 2029-02-15 | 2028-01-03 | -409 d |
| WEST FRESNO SUB - INSTALL 1113 FEEDER | New or upgraded circuit | On-going | 2028-06-16 | 2027-05-01 | -412 d |
| DESCHUETES 1101 4AR RECONDUCTORIN | New or upgraded circuit | Completed | 2027-05-28 | 2026-04-08 | -415 d |
| 06A - BORONDA 1102 FEEDER REINFORCMENT | Substation Upgrades | On-going | 2027-07-16 | 2026-05-22 | -420 d |
| INSTALL 7TH STANDARD 2106 FEEDER | Substation Upgrades | On-going | 2027-06-01 | 2026-03-31 | -427 d |
| ROCKLIN 1102 - PH1 | New or upgraded circuit | On-going | 2028-02-02 | 2026-12-02 | -427 d |
| INSTALL NEW RIPON 1705 FEEDER | New or upgraded circuit | On-going | 2029-09-14 | 2028-07-12 | -429 d |
| TULARE LAKE SUB - INSTALL 1105 FEEDER | New or upgraded circuit | On-going | 2029-08-03 | 2028-05-29 | -431 d |
| CAMDEN 1106 NEW FEEDER CAPACITY | New or upgraded circuit | On-going | 2029-03-15 | 2028-01-02 | -438 d |
| COTTONWOOD INSTALL NEW FEEDER | New or upgraded circuit | On-going | 2029-04-02 | 2028-01-03 | -455 d |
| MOMENTUM SUBSTATION:DIST FDR WO (2027) | Substation Upgrades | On-going | 2029-04-09 | 2028-01-01 | -464 d |
| LAKEVIEW: INSTALL 1108 FEEDER | New or upgraded circuit | On-going | 2027-09-10 | 2026-06-01 | -466 d |
| DAIRYLAND 1111 - REGS | New or upgraded circuit | Completed | 2027-03-31 | 2025-12-20 | -466 d |
| OLD RIVER INSTALL 1106 DIST. CIRCUIT | New or upgraded circuit | Completed | 2027-03-31 | 2025-12-08 | -478 d |
| ORLAND B BANK 1 REPLACEMENT | Substation Upgrades | On-going | 2029-07-02 | 2028-03-03 | -486 d |
| WEST FRESNO SUB - INSTALL 1114 FEEDER | New or upgraded circuit | On-going | 2028-08-31 | 2027-05-01 | -488 d |
| SAND CREEK 1103 RECONDUCTOR - SEGMENT 2 | New or upgraded circuit | Paused | 2029-12-31 | 2028-08-29 | -489 d |
| 21KV CUTOVER - SOLEDAD 2102 - T1457 | New or upgraded circuit | On-going | 2028-08-01 | 2027-03-03 | -517 d |
| CRESCENT SW STA-SCHINDLER - RPL PL | New or upgraded circuit | On-going | 2026-10-03 | 2025-05-01 | -520 d |
| FORT ORD 2107_CAPACITY_EXTENSION - OH | New or upgraded circuit | On-going | 2027-10-05 | 2026-04-23 | -530 d |
| HARDING: REPL 60/4KV BK 1 | Substation Upgrades | On-going | 2029-07-06 | 2027-12-31 | -553 d |
| EIGHT MILE 2106 FEEDER EXTENSION PH 1 | New or upgraded circuit | On-going | 2028-11-14 | 2027-05-07 | -557 d |
| AUD-ATEJON 12 AND 21 KV LINE WK PKGE #1 | Substation Upgrades | On-going | 2028-07-27 | 2027-01-11 | -563 d |
| MWC46/06 - Install Tevis Bk3 | New or upgraded circuit | Pre-execution | 2028-12-30 | 2027-06-02 | -577 d |
| 06A - BORONDA 1102 FEEDER REINFORCMENT | Substation Upgrades | On-going | 2028-03-27 | 2026-08-26 | -579 d |
| TUPMAN 1107 1108 FEEDER DIST WORK | Substation Upgrades | On-going | 2029-02-13 | 2027-06-14 | -610 d |
| LOGAN CREEK 2103 PH1 (2027) | New or upgraded circuit | On-going | 2029-01-31 | 2027-05-26 | -616 d |
| Templeton Bank 2 Upgrade Distribution Line Work | New or upgraded circuit | On-going | 2028-10-16 | 2027-01-30 | -625 d |
| AUD-ATEJON 12 AND 21 KV LINE WK PKGE #1 | Substation Upgrades | On-going | 2028-07-31 | 2026-11-09 | -630 d |
| SPENCE 1101 UNDER SOLEDAD #1 T-LINE | New or upgraded circuit | On-going | 2028-06-30 | 2026-09-30 | -639 d |
| WEBER 1112 - PH2 - FEEDER EXTENSION | New or upgraded circuit | On-going | 2028-10-09 | 2027-01-09 | -639 d |
| GUSTINE 1103-NEW CIRCUIT OUTLET | Substation Upgrades | On-going | 2030-01-31 | 2028-05-01 | -640 d |
| SPENCE 1101 UNDER SOLEDAD #1 T-LINE | New or upgraded circuit | On-going | 2028-07-03 | 2026-09-30 | -642 d |
| INDUSTRIAL ACRES - 12KV CUTOVER | Substation Upgrades | On-going | 2028-12-19 | 2027-03-02 | -658 d |
| ROUGH AND READY 1102 RECONDUCTORING | New or upgraded circuit | On-going | 2028-07-31 | 2026-09-30 | -670 d |
| Install San Bernard Bank 2 | Substation Upgrades | Completed | 2026-12-30 | 2025-02-06 | -692 d |
| SM1107 MAINLINE & RANCHITA CANYON RECOND | New or upgraded circuit | On-going | 2028-12-20 | 2027-01-23 | -697 d |
| Coalinga No.1 1105 New Feeder with Bank 2 upgrade | Substation Upgrades | Completed | 2028-03-29 | 2026-04-24 | -705 d |
| Templeton Bank 2 Upgrade Distribution Line Work | Substation Upgrades | On-going | 2028-12-19 | 2027-01-11 | -708 d |
| SM1107 MAINLINE & RANCHITA CANYON RECOND | New or upgraded circuit | On-going | 2028-12-20 | 2027-01-12 | -708 d |
| SM1107 MAINLINE & RANCHITA CANYON RECOND | New or upgraded circuit | On-going | 2028-12-28 | 2027-01-12 | -716 d |
| WHEELER RIDGE 21KV FEEDERS PH II | Substation Upgrades | On-going | 2030-03-08 | 2028-03-20 | -718 d |
| Stockton A Bank 5 Upgrade | Substation Upgrades | Pre-execution | 2029-12-31 | 2028-01-08 | -722 d |
| Templeton Bank 2 Upgrade Distribution Line Work | New or upgraded circuit | On-going | 2029-03-01 | 2027-01-31 | -760 d |
| CHARCA INSTALL 1101 DIST. CIRCUIT | New or upgraded circuit | Completed | 2028-07-03 | 2026-05-30 | -765 d |
| NEW SUBSTATION_WEBER AREA - MARIPOSA RD | Substation Upgrades | On-going | 2029-02-13 | 2026-12-30 | -776 d |
| 06A - BORONDA 1102 FEEDER REINFORCMENT | Substation Upgrades | On-going | 2028-10-04 | 2026-08-18 | -778 d |
| OTTER 1102 BIG SUR RECON | New or upgraded circuit | On-going | 2028-11-30 | 2026-08-15 | -838 d |
| OTTER 1102 BIG SUR RECON | New or upgraded circuit | On-going | 2028-11-30 | 2026-08-15 | -838 d |
| OTTER 1102 BIG SUR RECON | New or upgraded circuit | On-going | 2028-11-30 | 2026-08-15 | -838 d |
| SPENCE 1101 UNDER SOLEDAD #1 T-LINE | New or upgraded circuit | Completed | 2027-08-26 | 2025-04-28 | -850 d |
| EL CAPITAN -NEW CIRCUIT 2111 OUTLET | Substation Upgrades | On-going | 2031-08-13 | 2029-02-05 | -919 d |
| New 30MVA bank-2 | Substation Upgrades | Completed | 2027-04-02 | 2024-09-16 | -928 d |
| REPLACE GARBERVILLE 12KV BUS AND SUB REG | New or upgraded circuit | On-going | 2030-12-13 | 2028-04-27 | -960 d |
| MWC 46/06 - New Fairway 1102 Feeder | New or upgraded circuit | On-going | 2030-03-01 | 2027-03-04 | -1,093 d |
| HARDING: REPL 60/4KV BK 1 | Substation Upgrades | On-going | 2029-05-18 | 2026-05-02 | -1,112 d |
| PASO1108/TEMP2109 UG MAINLINE | New or upgraded circuit | On-going | 2030-04-10 | 2027-01-20 | -1,176 d |
| STOREY 1102 NEW FEEDER | Substation Upgrades | Completed | 2029-07-26 | 2026-04-17 | -1,196 d |
| WHEELER RIDGE 21KV FEEDERS PH II | Substation Upgrades | On-going | 2029-09-27 | 2026-05-29 | -1,217 d |
| BANTA: REPL BANK 1 | Substation Upgrades | On-going | 2029-07-11 | 2026-01-01 | -1,287 d |
| LAMMERS NEW 1109 & 1110 FEEDERS | Substation Upgrades | On-going | 2030-04-03 | 2026-01-02 | -1,552 d |
| RE-ROUTE FRENCH CAMP FEEDERS | New or upgraded circuit | On-going | 2030-08-15 | 2026-05-05 | -1,563 d |
| Reedley bank 3 - bus tie connection upgrade and Reedley 1106 feeder outlet repull to 1100AL | New or upgraded circuit | Cancelled | 2023-05-01 | — | — |
| AIRWAYS 1107 TO SANGER 1114 TIE | New or upgraded circuit | Cancelled | 2026-05-29 | — | — |
| Vierra 1702 - Replace (2) S.B. w/900A OH U.S. switches | New or upgraded circuit | Cancelled | 2024-12-13 | — | — |
| FAMOSO 1102 - LV & PF | New or upgraded circuit | Planned Solution | 2023-05-30 | — | — |
| BANTA BK 1 - D LINE SEGMENT 1 | Substation Upgrades | Planned Solution | 2027-02-02 | — | — |
| SM 1104 RELOCATE R45812 AND INSTALL CAP | New or upgraded circuit | Cancelled | 2026-05-28 | — | — |
| 46H - Fruitland Bank Replacement work | Substation Upgrades | Cancelled | 2024-12-31 | — | — |
| CATLETT 1105: CIRCUIT REINFORCEMENT | New or upgraded circuit | Cancelled | 2026-06-04 | — | — |
| ELK CREEK 1101- INSTALL 100A REG | New or upgraded circuit | Cancelled | 2020-12-30 | — | — |
| ELK CREEK 1101- INSTALL 100A REG | New or upgraded circuit | Planned Solution | 2025-04-30 | — | — |
| FIGARDEN 2113 RECONDUCTER 4/0AL | New or upgraded circuit | Cancelled | 2026-06-01 | — | — |
| Lerdo 1113 Reconfiguration | New or upgraded circuit | Cancelled | 2023-05-30 | — | — |
| TULARE LAKE 1106 RE-CONDUCTOR | New or upgraded circuit | Cancelled | 2026-10-15 | — | — |
| LOCKEFORD2102 SETS OF 200A VOLTAGE REGS | New or upgraded circuit | Cancelled | 2025-05-30 | — | — |
| LOCKEFORD2102 SETS OF 100A VOLTAGE REGS | New or upgraded circuit | Cancelled | 2025-06-12 | — | — |
| Reedley Substation_Install 1114 Feeder | New or upgraded circuit | Cancelled | 2026-05-01 | — | — |
| Reedley Substation_Install 1114 Feeder | New or upgraded circuit | Cancelled | 2026-05-01 | — | — |
| COALINGA NO. 2 EXPANSION | New or upgraded circuit | Planned Solution | 2027-02-18 | — | — |
| New 30MVA bank-2 | Substation Upgrades | Cancelled | 2025-12-31 | — | — |
| Mendota - Install Bank 1 | New or upgraded circuit | Planned Solution | 2024-12-30 | — | — |
| Wasco 1102 - Reconductor 6Cu with 397Al | New or upgraded circuit | Pre-execution | N/A | 2026-05-31 | — |
| LE GRAND 1106 RECONDUCTORING | New or upgraded circuit | Planned Solution | 2027-08-16 | — | — |
| Replace Chowchilla Bk 2, 16MVA w/45MVA Bk | New or upgraded circuit | Cancelled | 2028-01-28 | — | — |
| FRENCH CAMP REPLACE BANK 2 | Substation Upgrades | Cancelled | 2028-01-30 | — | — |
| Schindler 1110 OL and PF Correction | New or upgraded circuit | Pre-execution | N/A | 2027-05-03 | — |
| WYAN 1109: RPLC SW 5483 & 1505 TO 900USB | New or upgraded circuit | Planned Solution | 2025-05-30 | — | — |
| Midway 1105 Reconductor | New or upgraded circuit | Planned Solution | 2025-04-25 | — | — |
| MWC 06H - Live Oak 1104 Reconductor 8700 feet of 2C and 4C | New or upgraded circuit | Cancelled | 2024-04-30 | — | — |
| ANITA 1101: INSTALL 200 AMP REGULATOR | New or upgraded circuit | Planned Solution | 2026-06-25 | — | — |
| Chualar Substation: Inst Transf Bank | Substation Upgrades | Planned Solution | 2024-12-31 | — | — |
| PANOCHE 1103 RECONFIGURE TO TRFR LOAD | New or upgraded circuit | Planned Solution | 2027-04-29 | — | — |
| CURTIS 1704 - GREENLEY RD CLOSE UG LOOP | New or upgraded circuit | Planned Solution | 2026-10-02 | — | — |
| LOCKEFORD SUB_INST BK5 AND TWO 21KV FDRS | Substation Upgrades | Cancelled | 2025-03-12 | — | — |
| LOCKEFORD SUB_INST BK5 AND TWO 21KV FDRS | Substation Upgrades | Cancelled | 2030-07-24 | — | — |
| RECONDUCTOR ~4,600FT OH - RIPON 1701 | New or upgraded circuit | Planned Solution | 2026-06-01 | — | — |
| Cuyama 1104-Install Reg | New or upgraded circuit | Pre-execution | N/A | 2026-09-29 | — |
| Fruitvale 1106 Reconductor | New or upgraded circuit | Pre-execution | N/A | 2027-12-31 | — |
| Corning Substation - Install Feeder | New or upgraded circuit | Cancelled | 2024-12-30 | — | — |
| Corning Substation - Install Feeder | New or upgraded circuit | Cancelled | 2026-12-31 | — | — |
| OAK PARK - INSTALL NEW BANK AND FEEDER | Substation Upgrades | Planned Solution | 2027-12-31 | — | — |
| MORMON NEW BK2 & 1-12KV FEEDER | Substation Upgrades | Cancelled | 2027-05-28 | — | — |
| MORMON NEW BK2 & 1-12KV FEEDER | New or upgraded circuit | Cancelled | 2027-12-31 | — | — |
| CARUTHERS 1105 RECONDUCTORING | New or upgraded circuit | Cancelled | 2023-05-31 | — | — |
| Stockton A 1104 Feeder Outlet Replacement | New or upgraded circuit | Pre-execution | N/A | 2027-12-16 | — |
| Stockton A 1106 Feeder Outlet Replacement | New or upgraded circuit | Pre-execution | N/A | 2027-12-16 | — |
| Stockton A Bank 3 12kV Bus Upgrade | Substation Upgrades | Pre-execution | N/A | 2028-11-01 | — |
| Reconductor 397Al with 715Al on Olivehurst 1103 | New or upgraded circuit | Pre-execution | N/A | 2028-02-24 | — |
| CARBONA 1102 RECONDUCTOR | New or upgraded circuit | Cancelled | 2024-12-30 | — | — |
| MWC 46/06 Install Storey 1103 Circuit | New or upgraded circuit | Cancelled | 2028-11-06 | — | — |
| BUELLTON 1102 MAINLINE TIE UG UPGRADE | New or upgraded circuit | Cancelled | 2024-06-28 | — | — |
| Smyrna 1102 reconductor- transfer from Smyrna 1106 | New or upgraded circuit | Cancelled | 2028-05-30 | — | — |
| SANTA MARIA 1110 - EOL VOLTAGE SUPPORT | New or upgraded circuit | Cancelled | 2023-06-29 | — | — |
| Charca 1102 OL, LV Correction | New or upgraded circuit | Planned Solution | 2023-05-30 | — | — |
| GLENN 1101 RECONDUCTOR 4/0AL TO 715AL | New or upgraded circuit | Planned Solution | 2025-05-30 | — | — |
| SCHINDLER 1105 RESOLVE OVERLOAD AND LOW | New or upgraded circuit | Cancelled | 2026-06-30 | — | — |
| TERMINOUS 1102 FUSE REPLACE WITH LR DUE TO ABNORMAL CONDTION | New or upgraded circuit | Cancelled | 2025-04-30 | — | — |
| R3 SCHINDLER 1112 - RECON, INST 2 CAPS | New or upgraded circuit | Cancelled | 2023-12-29 | — | — |
| GATES 1105 OVERLOAD CORRECTION | New or upgraded circuit | Planned Solution | 2023-02-24 | — | — |
| GATES 1106 RECONDUCTOR & DEVICE UPGRADES | New or upgraded circuit | Planned Solution | 2025-05-30 | — | — |
| MCFARLAND 1102 - OL, LV & PF | New or upgraded circuit | Cancelled | 2023-05-30 | — | — |
| GOOSE LAKE 2104 - OL, LV & PF | New or upgraded circuit | Planned Solution | 2026-05-29 | — | — |
| SMYRNA 1105 - OL & LV CORRECTION | New or upgraded circuit | Planned Solution | 2026-05-29 | — | — |
| Replace SB 80999 with 900A_SW | New or upgraded circuit | Cancelled | 2024-05-31 | — | — |
| DAIRYLAND 1109 RECONDUCTORING | New or upgraded circuit | Planned Solution | 2026-05-29 | — | — |
| E.Stockton 1101 Recondutoring | New or upgraded circuit | Cancelled | 2024-05-31 | — | — |
| Replace FC Bank1 and install French Camp fdrs | Substation Upgrades | Cancelled | 2024-12-30 | — | — |
| Replace FC Bank1 and install French Camp fdrs | Substation Upgrades | Cancelled | 2028-01-31 | — | — |
| Replace FC Bank1 and install French Camp fdrs | Substation Upgrades | Cancelled | 2031-01-21 | — | — |
| Weber 1110 - Install 1-1200KVAR SCADA CAP | New or upgraded circuit | Cancelled | 2027-04-01 | — | — |
| BIOLA 1102 - INSTALL REGULATOR | New or upgraded circuit | Cancelled | 2025-05-30 | — | — |
| BIOLA 1103 - INSTALL REGULATORS | New or upgraded circuit | Cancelled | 2025-05-30 | — | — |
| KERMAN 1106 INSTALL REGULATORS | New or upgraded circuit | Cancelled | 2025-05-30 | — | — |
| HOLLISTER 2101 REDUCE CUSTOMER COUNT | New or upgraded circuit | Cancelled | 2026-03-30 | — | — |
| EP-ATASCADERO 1101 FUSE 4663 ZONE 3RD PH | New or upgraded circuit | Cancelled | 2024-12-14 | — | — |
| STRESSED EQUIPMENT - LOS PADRES | New or upgraded circuit | Cancelled | 2025-12-30 | — | — |
| HERDLYN 1102 RECONDUCTOR - BETHANY RD | New or upgraded circuit | Cancelled | 2024-12-30 | — | — |
| RECONDUCTOR EL CAMINO REAL (101 HWY) | New or upgraded circuit | Cancelled | 2025-11-19 | — | — |
| REINFORCE SALINAS 1106 - T&A | New or upgraded circuit | Cancelled | 2025-12-30 | — | — |
| Lammers 1102 - Reconductor 2200ft w/1100Al UG Cable | New or upgraded circuit | Planned Solution | 2026-03-25 | — | — |
| Cassidy- Border Coppermine 70kV | New or upgraded circuit | Cancelled | 2025-02-07 | — | — |
| Dinuba 1104 - Reconductor 1/0 and 4/0 with 715AL | New or upgraded circuit | Planned Solution | 2027-05-07 | — | — |
| Goose Lake 1106 - OL & LV | New or upgraded circuit | Cancelled | 2026-05-29 | — | — |