Grid history
What changed on the grid, and when
These datasets are overwritten in place and keep no history, so nobody can tell you what changed. This archive snapshots them and diffs consecutive captures.
Updated 2026-09-12 · 4 datasets · 2,118,185 rows held · Source: PG&E GRIP, Texas Comptroller
Data centre supply pipeline
Every data-centre building on record, normalised onto one lifecycle vocabulary. No megawatts: that figure is a lease fact and is not on record anywhere.
Grid datasets
PG&E large-load pipeline
no diff yetNew load projects queued on PG&E distribution circuits, by type and stage.
- Rows
- 30,866
- Snapshot
- 2026-09-11
- Last changed
- 2026-08-27
PG&E ICA hosting capacity
no diff yetPer-line-section generation and load headroom, and PG&E own pass/fail screen.
- Rows
- 2,086,800
- Snapshot
- 2026-09-04
- Last changed
- 2026-08-27
PG&E grid needs and project slip
no diff yetSubstation capacity gaps to 2040, and how far planned fixes have slipped.
- Rows
- 360
- Snapshot
- 2026-09-11
- Last changed
- 2026-09-11
plus 4,457 gna needs, 1,340 planned investments
Texas certified data centres
no diff yetState certification roster mapping owner LLC to the operator that runs the site.
- Rows
- 159
- Snapshot
- 2026-09-11
- Last changed
- not stated
-99.99 placeholder in its expected-load column — a figure the utility will not publish — so no page here states a megawatt figure for a load project. What these datasets support is where, what type, how far along, and what moved.