What the utility published, and when
PG&E and the Texas Comptroller overwrite these publications in place. They keep no history, so nobody can tell you what changed. This archive snapshots them and diffs consecutive captures.
Exported 2026-09-12 · 4 datasets · 2,118,185 rows held
Data centre supply pipeline
Every data-centre building a county, city or regional authority publishes, normalised onto one lifecycle vocabulary and shaped after datacenterHawk’s own API. No megawatts: that figure is a lease fact and nobody publishes it.
Utility publications
PG&E large-load pipeline
New load projects queued on PG&E distribution circuits, by type and stage.
- Rows
- 30,866
- Snapshot
- 2026-09-11
- Utility last wrote
- 2026-08-27
PG&E ICA hosting capacity
Per-line-section generation and load headroom, and PG&E own pass/fail screen.
- Rows
- 2,086,800
- Snapshot
- 2026-09-04
- Utility last wrote
- 2026-08-27
PG&E grid needs and project slip
Substation capacity gaps to 2040, and how far planned fixes have slipped.
- Rows
- 360
- Snapshot
- 2026-09-11
- Utility last wrote
- 2026-09-11
plus 4,457 gna needs, 1,340 planned investments
Texas certified data centres
State certification roster mapping owner LLC to the operator that runs the site.
- Rows
- 159
- Snapshot
- 2026-09-11
- Utility last wrote
- the page publishes no as-of date
-99.99 into numeric columns it will not publish. Every row of the large-load pipeline carries that sentinel in its expected-load column, so no page here states a megawatt figure for a load project. What these datasets support is where, what type, how far along, and what moved.