Grid history

What moved

These records are overwritten in place and keep no history. A building that went from Planned to Under construction last month exists nowhere except in an archive that was already running — which is the entire reason this one exists.

0 events · updated 2026-09-12 · updatedSince supported

Change events
0
one snapshot held
Classes defined
9
each proven red-then-green
Last updated
2026-09-12
Facilities tracked
927
No events yet, and that is the correct result. Every facility is held at exactly one snapshot so far, and a diff needs two. No synthetic second snapshot has been fabricated to fill this.

What this feed will report

Nine classes. Each is exercised by a synthetic fixture in the test suite and was verified to fail when removed from the engine.

EventWhat it meansSeen
Stage advancedBUILDING_STATUS_ADVANCEPlanned → Under construction → Operational. The headline event.0
Stage regressedBUILDING_STATUS_REVERSEA building that went back down the ladder. Rarer and more interesting: a project in trouble.0
Floor area upGFA_UPMore floor area approved than last time.0
Floor area downGFA_DOWNA redesign, or a phase dropped out.0
Occupancy grantedOCCUPANCY_DATEDA certificate-of-occupancy date appeared. The closest analogue to commissioning.0
New buildingBUILDING_NEWA building appeared that was not there before.0
Building removedBUILDING_REMOVEDIt dropped out of the records. Not the same as cancelled — rows drop out for reasons that are not stated.0
Campus stage changedCAMPUS_STATUS_CHANGEThe parcel-level project moved, which usually precedes its buildings moving.0
Operator resolvedOPERATOR_RESOLVEDA shell LLC became a named operator.0
A second snapshot is a calendar constraint, not an engineering one. Most of these records carry a last-edit timestamp, so the archive re-captures as soon as they change; the rest are re-checked weekly. No synthetic second capture has been fabricated to make this page look busier — see what this dataset does not contain.