Manatee Solar Energy Center

Manatee Solar Energy Center is a 484 MW battery storage project in Manatee County, Florida, operated by Florida Power & Light Co. EIA-860M lists 2 generating units here. Its units entered service between 2016 and 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
483.5 MW
483.5 MW net summer
Generating units
2
In service
2016–2021
EIA plant ID
60014

Where it is

Loading map…
County
Manatee County, Florida
Coordinates
27.6075, -82.3553
Balancing authority
FPL
Sector
Electric Utility

Units, technology and status

Operator of record
Florida Power & Light Co
Primary energy source
Battery
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Battery 409 MW, Solar 75 MW. It is filed here under Battery, the source with the most capacity.

Every plant Florida Power & Light Co reports to EIA →

Manatee Solar Energy Center: FAQ

Where is Manatee Solar Energy Center?
In Manatee County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Manatee Solar Energy Center?
484 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Manatee Solar Energy Center?
EIA-860M names Florida Power & Light Co as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Manatee Solar Energy Center LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Florida Power & Light Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Manatee Solar Energy Center LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Manatee Solar Energy Center still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.