Camp Atterbury Microgrid Hybrid
Camp Atterbury Microgrid Hybrid is a 7 MW battery storage project in Johnson County, Indiana, operated by Duke Energy Indiana, LLC. EIA-860M lists 2 generating units here, inside MISO. Its units entered service in 2019.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 7 MW
- 7 MW net summer
- Generating units
- 2
- In service
- 2019
- EIA plant ID
- 63324
Where it is
Loading map…
- County
- Johnson County, Indiana
- Coordinates
- 39.3617, -86.025
- Balancing authority
- MISO
- Sector
- Electric Utility
Units, technology and status
- Operator of record
- Duke Energy Indiana, LLC
- Primary energy source
- Battery
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. EIA-860M capacity splits: Battery 5 MW, Solar 2 MW. It is filed here under Battery, the source with the most capacity.
Camp Atterbury Microgrid Hybrid: FAQ
- Where is Camp Atterbury Microgrid Hybrid?
- In Johnson County, Indiana (IN). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Camp Atterbury Microgrid Hybrid?
- 7 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
- Who owns Camp Atterbury Microgrid Hybrid?
- EIA-860M names Duke Energy Indiana, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Camp Atterbury Microgrid Hybrid LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Duke Energy Indiana, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Camp Atterbury Microgrid Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Camp Atterbury Microgrid Hybrid still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.