Metro Wastewater Reclamation District

Metro Wastewater Reclamation District is a 15 MW biomass power plant in Denver County, Colorado, operated by ENGIE Denver Metro LLC. EIA-860M lists 6 generating units here. Its units entered service between 1985 and 2000.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
15 MW
9.8 MW net summer
Generating units
6
In service
1985–2000
EIA plant ID
10180

Where it is

Loading map…
County
Denver County, Colorado
Coordinates
39.8078, -104.9542
Balancing authority
PSCO
Sector
IPP CHP

Units, technology and status

Operator of record
ENGIE Denver Metro LLC
Primary energy source
Biomass
Technologies
Other Waste Biomass
Status
Out of service and NOT expected to return to service in next calendar year (2) · Standby/Backup (2) · Operating (2)

Every plant ENGIE Denver Metro LLC reports to EIA →

Metro Wastewater Reclamation District: FAQ

Where is Metro Wastewater Reclamation District?
In Denver County, Colorado (CO). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Metro Wastewater Reclamation District?
15 MW of nameplate capacity across 6 units, as of the EIA-860M release for 2026-07.
Who owns Metro Wastewater Reclamation District?
EIA-860M names ENGIE Denver Metro LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Metro Wastewater Reclamation District LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — ENGIE Denver Metro LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Metro Wastewater Reclamation District LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Metro Wastewater Reclamation District still running?
EIA-860M files it as "Out of service and NOT expected to return to service in next calendar year" for 2026-07. Statuses change monthly, and this page follows the monthly release.