MCLB Landfill Gas to Energy

MCLB Landfill Gas to Energy is a 4 MW biomass power plant in Dougherty County, Georgia, operated by Inst and Envir Div Marine Logistics Base. EIA-860M lists 2 generating units here. Its units entered service between 2011 and 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
4 MW
3.6 MW net summer
Generating units
2
In service
2011–2021
EIA plant ID
59335

Where it is

Loading map…
County
Dougherty County, Georgia
Coordinates
31.5461, -84.0675
Balancing authority
SOCO
Sector
IPP CHP

Units, technology and status

Operator of record
Inst and Envir Div Marine Logistics Base
Primary energy source
Biomass
Technologies
Landfill Gas
Status
Operating (1) · Standby/Backup (1)

Every plant Inst and Envir Div Marine Logistics Base reports to EIA →

MCLB Landfill Gas to Energy: FAQ

Where is MCLB Landfill Gas to Energy?
In Dougherty County, Georgia (GA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is MCLB Landfill Gas to Energy?
4 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns MCLB Landfill Gas to Energy?
EIA-860M names Inst and Envir Div Marine Logistics Base as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as MCLB Landfill Gas to Energy LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Inst and Envir Div Marine Logistics Base here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "MCLB Landfill Gas to Energy LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is MCLB Landfill Gas to Energy still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.