PCA-Valdosta Mill

PCA-Valdosta Mill is a 70 MW biomass power plant in Lowndes County, Georgia, operated by PCA-Valdosta Mill. It has 3 generating units here. Its units entered service between 1954 and 2011.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
69.9 MW
69.9 MW net summer
Generating units
3
In service
1954–2011
Plant code
60084

Where it is

Loading map…
County
Lowndes County, Georgia
Coordinates
30.6944, -83.3031
Balancing authority
SOCO
Sector
Industrial CHP

Units, technology and status

Operator of record
PCA-Valdosta Mill
Primary energy source
Biomass
Technologies
Wood/Wood Waste Biomass
Status
Operating

PCA-Valdosta Mill: FAQ

Where is PCA-Valdosta Mill?
In Lowndes County, Georgia (GA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is PCA-Valdosta Mill?
70 MW of nameplate capacity across 3 units, as of 2026-07.
Who owns PCA-Valdosta Mill?
PCA-Valdosta Mill is the operator of record. That is not always the ultimate owner.
Is this the same as PCA-Valdosta Mill LLC?
Probably, but the plant data does not say. It records a plant name and an operator — PCA-Valdosta Mill here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "PCA-Valdosta Mill LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is PCA-Valdosta Mill still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.