PCA-Valdosta Mill

PCA-Valdosta Mill is a 70 MW biomass power plant in Lowndes County, Georgia, operated by PCA-Valdosta Mill. EIA-860M lists 3 generating units here. Its units entered service between 1954 and 2011.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
69.9 MW
69.9 MW net summer
Generating units
3
In service
1954–2011
EIA plant ID
60084

Where it is

Loading map…
County
Lowndes County, Georgia
Coordinates
30.6944, -83.3031
Balancing authority
SOCO
Sector
Industrial CHP

Units, technology and status

Operator of record
PCA-Valdosta Mill
Primary energy source
Biomass
Technologies
Wood/Wood Waste Biomass
Status
Operating

Every plant PCA-Valdosta Mill reports to EIA →

PCA-Valdosta Mill: FAQ

Where is PCA-Valdosta Mill?
In Lowndes County, Georgia (GA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is PCA-Valdosta Mill?
70 MW of nameplate capacity across 3 units, as of the EIA-860M release for 2026-07.
Who owns PCA-Valdosta Mill?
EIA-860M names PCA-Valdosta Mill as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as PCA-Valdosta Mill LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — PCA-Valdosta Mill here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "PCA-Valdosta Mill LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is PCA-Valdosta Mill still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.