Wheelabrator Baltimore Refuse

Wheelabrator Baltimore Refuse is a 65 MW biomass power plant in Baltimore City County, Maryland, operated by Wheelabrator Environmental Systems. EIA-860M lists 2 generating units here, inside PJM. Its units entered service between 1984 and 2001.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
64.5 MW
61.3 MW net summer
Generating units
2
In service
1984–2001
EIA plant ID
10629

Where it is

Loading map…
County
Baltimore City County, Maryland
Coordinates
39.266, -76.6296
Balancing authority
PJM
Sector
IPP CHP

Units, technology and status

Operator of record
Wheelabrator Environmental Systems
Primary energy source
Biomass
Technologies
Municipal Solid Waste
Status
Operating

Every plant Wheelabrator Environmental Systems reports to EIA →

Wheelabrator Baltimore Refuse: FAQ

Where is Wheelabrator Baltimore Refuse?
In Baltimore City County, Maryland (MD). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Wheelabrator Baltimore Refuse?
65 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Wheelabrator Baltimore Refuse?
EIA-860M names Wheelabrator Environmental Systems as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Wheelabrator Baltimore Refuse LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Wheelabrator Environmental Systems here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Wheelabrator Baltimore Refuse LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Wheelabrator Baltimore Refuse still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.