Ameresco Chicopee Energy

Ameresco Chicopee Energy is a 8 MW biomass power plant in Hampden County, Massachusetts, operated by AMERESCO Chicopee Energy LLC. EIA-860M lists 4 generating units here, inside ISO New England. Its units entered service between 2004 and 2010.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
7.8 MW
7.7 MW net summer
Generating units
4
In service
2004–2010
EIA plant ID
56426

Where it is

Loading map…
County
Hampden County, Massachusetts
Coordinates
42.1626, -72.5367
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
AMERESCO Chicopee Energy LLC
Primary energy source
Biomass
Technologies
Landfill Gas
Status
Out of service and NOT expected to return to service in next calendar year

Every plant AMERESCO Chicopee Energy LLC reports to EIA →

Ameresco Chicopee Energy: FAQ

Where is Ameresco Chicopee Energy?
In Hampden County, Massachusetts (MA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Ameresco Chicopee Energy?
8 MW of nameplate capacity across 4 units, as of the EIA-860M release for 2026-07.
Who owns Ameresco Chicopee Energy?
EIA-860M names AMERESCO Chicopee Energy LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Ameresco Chicopee Energy LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — AMERESCO Chicopee Energy LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Ameresco Chicopee Energy LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Ameresco Chicopee Energy still running?
EIA-860M files it as "Out of service and NOT expected to return to service in next calendar year" for 2026-07. Statuses change monthly, and this page follows the monthly release.