Southbridge Landfill Gas-to-Energy
Southbridge Landfill Gas-to-Energy is a 2 MW biomass power plant in Worcester County, Massachusetts, operated by Southbridge Recycling and Disposal Park. EIA-860M lists 1 generating unit here, inside ISO New England. Its unit entered service in 2011.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 1.6 MW
- 1.5 MW net summer
- Generating units
- 1
- In service
- 2011
- EIA plant ID
- 59011
Where it is
Loading map…
- County
- Worcester County, Massachusetts
- Coordinates
- 42.1044, -72.0325
- Balancing authority
- ISNE
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Southbridge Recycling and Disposal Park
- Primary energy source
- Biomass
- Technologies
- Landfill Gas
- Status
- Operating
Every plant Southbridge Recycling and Disposal Park reports to EIA →
Southbridge Landfill Gas-to-Energy: FAQ
- Where is Southbridge Landfill Gas-to-Energy?
- In Worcester County, Massachusetts (MA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Southbridge Landfill Gas-to-Energy?
- 2 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
- Who owns Southbridge Landfill Gas-to-Energy?
- EIA-860M names Southbridge Recycling and Disposal Park as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Southbridge Landfill Gas-to-Energy LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Southbridge Recycling and Disposal Park here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Southbridge Landfill Gas-to-Energy LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Southbridge Landfill Gas-to-Energy still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.