Flathead Landfill to Gas Energy Facility is a 3 MW biomass power plant in Flathead County, Montana, operated by Flathead Electric Coop Inc. EIA-860M lists 2 generating units here. Its units entered service between 2009 and 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
3.2 MW
3.2 MW net summer
Generating units
2
In service
2009–2023
EIA plant ID
64505

Where it is

Loading map…
County
Flathead County, Montana
Coordinates
48.3131, -114.3421
Balancing authority
BPAT
Sector
Electric Utility

Units, technology and status

Operator of record
Flathead Electric Coop Inc
Primary energy source
Biomass
Technologies
Landfill Gas
Status
Operating

Every plant Flathead Electric Coop Inc reports to EIA →

Flathead Landfill to Gas Energy Facility: FAQ

Where is Flathead Landfill to Gas Energy Facility?
In Flathead County, Montana (MT). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Flathead Landfill to Gas Energy Facility?
3 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Flathead Landfill to Gas Energy Facility?
EIA-860M names Flathead Electric Coop Inc as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Flathead Landfill to Gas Energy Facility LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Flathead Electric Coop Inc here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Flathead Landfill to Gas Energy Facility LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Flathead Landfill to Gas Energy Facility still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.