Georgia-Pacific Toledo Mill is a 19 MW biomass power plant in Lincoln County, Oregon, operated by Georgia-Pacific Toledo LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2007.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 18.8 MW
- 13.4 MW net summer
- Generating units
- 1
- In service
- 2007
- EIA plant ID
- 58109
Where it is
Loading map…
- County
- Lincoln County, Oregon
- Coordinates
- 44.6119, -123.9319
- Balancing authority
- BPAT
- Sector
- Industrial CHP
Units, technology and status
- Operator of record
- Georgia-Pacific Toledo LLC
- Primary energy source
- Biomass
- Technologies
- Wood/Wood Waste Biomass
- Status
- Operating
Georgia-Pacific Toledo Mill: FAQ
- Where is Georgia-Pacific Toledo Mill?
- In Lincoln County, Oregon (OR). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Georgia-Pacific Toledo Mill?
- 19 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
- Who owns Georgia-Pacific Toledo Mill?
- EIA-860M names Georgia-Pacific Toledo LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Georgia-Pacific Toledo Mill LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Georgia-Pacific Toledo LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Georgia-Pacific Toledo Mill LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Georgia-Pacific Toledo Mill still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.