New River Clean Energy

New River Clean Energy is a 3 MW biomass power plant in Raleigh County, West Virginia, operated by Cox Enterprises. It has 2 generating units here, inside PJM. Its units entered service in 2017.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
3.2 MW
3.2 MW net summer
Generating units
2
In service
2017
Plant code
63246

Where it is

Loading map…
County
Raleigh County, West Virginia
Coordinates
37.8158, -81.1619
Balancing authority
PJM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Cox Enterprises
Primary energy source
Biomass
Technologies
Landfill Gas
Status
Operating

New River Clean Energy: FAQ

Where is New River Clean Energy?
In Raleigh County, West Virginia (WV). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is New River Clean Energy?
3 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns New River Clean Energy?
Cox Enterprises is the operator of record. That is not always the ultimate owner.
Is this the same as New River Clean Energy LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Cox Enterprises here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "New River Clean Energy LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is New River Clean Energy still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.