Geothermal Power Plants in Idaho
Every operating geothermal power plant in Idaho on EIA-860M for 2026-07: 1 plants, 1 generating units and 16 MW of nameplate capacity across 1 county.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 1
- 1 generating units
- Nameplate capacity
- 16 MW
- Counties
- 1
- Grid operator
- Mixed
- no single ISO covers a majority
Map of geothermal power plants in Idaho
Every one of the 1 plants is drawn at the coordinate EIA files for it.
Loading map…
- Geothermal · 1
List of geothermal power plants in Idaho
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
| Raft River Geothermal Power PlantGeothermal | US Geothermal Inc. | Cassia | 16 | 1 | 2025 | Operating |
Largest geothermal power plants in Idaho
- 1Raft River Geothermal Power PlantCassia County, Idaho16 MW
Geothermal power plants by county in Idaho
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Cassia | 1 | 16 |
Geothermal Power Plants in Idaho: FAQ
- How many geothermal power plants are in Idaho?
- 1, with 16 MW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
- Is there a map of Idaho geothermal power plants?
- Yes — the map above. Each dot is one geothermal power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest geothermal power plant in Idaho?
- Raft River Geothermal Power Plant, at 16 MW. The table is sorted largest first, so the rest follow it.
- Is there a geothermal power plant near me in Idaho?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Idaho's geothermal power plants?
- No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Idaho is largely a vertically integrated utility rather than an organised market.
- How current is this, and what is left out?
- EIA-860M for 2026-07. EIA technology "Geothermal". Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.