Arrowrock Hydroelectric Project

Arrowrock Hydroelectric Project is a 15 MW hydroelectric power plant in Elmore County, Idaho, operated by Boise-Kuna Irrigation District. It has 2 generating units here. Its units entered service in 2010.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
15 MW
16 MW net summer
Generating units
2
In service
2010
Plant code
56997

Where it is

Loading map…
County
Elmore County, Idaho
Coordinates
43.595, -115.9233
Balancing authority
IPCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Boise-Kuna Irrigation District
Primary energy source
Hydro
Technologies
Conventional Hydroelectric
Status
Operating

Arrowrock Hydroelectric Project: FAQ

Where is Arrowrock Hydroelectric Project?
In Elmore County, Idaho (ID). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Arrowrock Hydroelectric Project?
15 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Arrowrock Hydroelectric Project?
Boise-Kuna Irrigation District is the operator of record. That is not always the ultimate owner.
Is this the same as Arrowrock Hydroelectric Project LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Boise-Kuna Irrigation District here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Arrowrock Hydroelectric Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Arrowrock Hydroelectric Project still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.