Matilda Hamilton Fee Hydroelectric Stati
Matilda Hamilton Fee Hydroelectric Stati is a 3 MW hydroelectric power plant in Estill County, Kentucky, operated by Lock 12 Hydro Partners, LLC. EIA-860M lists 5 generating units here, inside PJM. Its units entered service in 2021.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 2.5 MW
- 2.5 MW net summer
- Generating units
- 5
- In service
- 2021
- EIA plant ID
- 62747
Where it is
Loading map…
- County
- Estill County, Kentucky
- Coordinates
- 37.6775, -83.9485
- Balancing authority
- PJM
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Lock 12 Hydro Partners, LLC
- Primary energy source
- Hydro
- Technologies
- Conventional Hydroelectric
- Status
- Operating
Matilda Hamilton Fee Hydroelectric Stati: FAQ
- Where is Matilda Hamilton Fee Hydroelectric Stati?
- In Estill County, Kentucky (KY). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Matilda Hamilton Fee Hydroelectric Stati?
- 3 MW of nameplate capacity across 5 units, as of the EIA-860M release for 2026-07.
- Who owns Matilda Hamilton Fee Hydroelectric Stati?
- EIA-860M names Lock 12 Hydro Partners, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Matilda Hamilton Fee Hydroelectric Stati LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Lock 12 Hydro Partners, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Matilda Hamilton Fee Hydroelectric Stati LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Matilda Hamilton Fee Hydroelectric Stati still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.