Matilda Hamilton Fee Hydroelectric Stati

Matilda Hamilton Fee Hydroelectric Stati is a 3 MW hydroelectric power plant in Estill County, Kentucky, operated by Lock 12 Hydro Partners, LLC. EIA-860M lists 5 generating units here, inside PJM. Its units entered service in 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
2.5 MW
2.5 MW net summer
Generating units
5
In service
2021
EIA plant ID
62747

Where it is

Loading map…
County
Estill County, Kentucky
Coordinates
37.6775, -83.9485
Balancing authority
PJM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Lock 12 Hydro Partners, LLC
Primary energy source
Hydro
Technologies
Conventional Hydroelectric
Status
Operating

Every plant Lock 12 Hydro Partners, LLC reports to EIA →

Matilda Hamilton Fee Hydroelectric Stati: FAQ

Where is Matilda Hamilton Fee Hydroelectric Stati?
In Estill County, Kentucky (KY). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Matilda Hamilton Fee Hydroelectric Stati?
3 MW of nameplate capacity across 5 units, as of the EIA-860M release for 2026-07.
Who owns Matilda Hamilton Fee Hydroelectric Stati?
EIA-860M names Lock 12 Hydro Partners, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Matilda Hamilton Fee Hydroelectric Stati LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Lock 12 Hydro Partners, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Matilda Hamilton Fee Hydroelectric Stati LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Matilda Hamilton Fee Hydroelectric Stati still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.