Verdi
Verdi is a 2 MW hydroelectric power plant in Washoe County, Nevada, operated by Truckee Meadows Water Authority. It has 1 generating unit here. Its unit entered service in 1911.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 2.4 MW
- 2.4 MW net summer
- Generating units
- 1
- In service
- 1911
- Plant code
- 6531
Where it is
Loading map…
- County
- Washoe County, Nevada
- Coordinates
- 39.3125, -119.585
- Balancing authority
- NEVP
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Truckee Meadows Water Authority
- Primary energy source
- Hydro
- Technologies
- Conventional Hydroelectric
- Status
- Operating
Verdi: FAQ
- Where is Verdi?
- In Washoe County, Nevada (NV). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Verdi?
- 2 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns Verdi?
- Truckee Meadows Water Authority is the operator of record. That is not always the ultimate owner.
- Is this the same as Verdi LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Truckee Meadows Water Authority here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Verdi LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Verdi still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.