Jordanelle Dam Hydroelectric Project

Jordanelle Dam Hydroelectric Project is a 13 MW hydroelectric power plant in Wasatch County, Utah, operated by Central Utah Water Conservancy District. EIA-860M lists 2 generating units here. Its units entered service in 2008.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
13 MW
13 MW net summer
Generating units
2
In service
2008
EIA plant ID
61853

Where it is

Loading map…
County
Wasatch County, Utah
Coordinates
40.5966, -111.4236
Balancing authority
PACE
Sector
Commercial Non-CHP

Units, technology and status

Operator of record
Central Utah Water Conservancy District
Primary energy source
Hydro
Technologies
Conventional Hydroelectric
Status
Operating

Every plant Central Utah Water Conservancy District reports to EIA →

Jordanelle Dam Hydroelectric Project: FAQ

Where is Jordanelle Dam Hydroelectric Project?
In Wasatch County, Utah (UT). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Jordanelle Dam Hydroelectric Project?
13 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Jordanelle Dam Hydroelectric Project?
EIA-860M names Central Utah Water Conservancy District as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Jordanelle Dam Hydroelectric Project LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Central Utah Water Conservancy District here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Jordanelle Dam Hydroelectric Project LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Jordanelle Dam Hydroelectric Project still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.