Jordanelle Dam Hydroelectric Project
Jordanelle Dam Hydroelectric Project is a 13 MW hydroelectric power plant in Wasatch County, Utah, operated by Central Utah Water Conservancy District. It has 2 generating units here. Its units entered service in 2008.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 13 MW
- 13 MW net summer
- Generating units
- 2
- In service
- 2008
- Plant code
- 61853
Where it is
Loading map…
- County
- Wasatch County, Utah
- Coordinates
- 40.5966, -111.4236
- Balancing authority
- PACE
- Sector
- Commercial Non-CHP
Units, technology and status
- Operator of record
- Central Utah Water Conservancy District
- Primary energy source
- Hydro
- Technologies
- Conventional Hydroelectric
- Status
- Operating
Jordanelle Dam Hydroelectric Project: FAQ
- Where is Jordanelle Dam Hydroelectric Project?
- In Wasatch County, Utah (UT). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Jordanelle Dam Hydroelectric Project?
- 13 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Jordanelle Dam Hydroelectric Project?
- Central Utah Water Conservancy District is the operator of record. That is not always the ultimate owner.
- Is this the same as Jordanelle Dam Hydroelectric Project LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Central Utah Water Conservancy District here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Jordanelle Dam Hydroelectric Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Jordanelle Dam Hydroelectric Project still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.