CCSU Co-Gen-STBY Gen

CCSU Co-Gen-STBY Gen is a 4 MW natural gas power plant in Hartford County, Connecticut, operated by Central Connecticut State University. EIA-860M lists 4 generating units here, inside ISO New England. Its units entered service between 1993 and 2012.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
3.6 MW
3.6 MW net summer
Generating units
4
In service
1993–2012
EIA plant ID
58224

Where it is

Loading map…
County
Hartford County, Connecticut
Coordinates
41.6914, -72.7686
Balancing authority
ISNE
Sector
Commercial CHP

Units, technology and status

Operator of record
Central Connecticut State University
Primary energy source
Natural gas
Technologies
Natural Gas Internal Combustion Engine, Petroleum Liquids
Status
Standby/Backup

This site runs on more than one energy source. EIA-860M capacity splits: Natural gas 3 MW, Petroleum 1 MW. It is filed here under Natural gas, the source with the most capacity.

Every plant Central Connecticut State University reports to EIA →

CCSU Co-Gen-STBY Gen: FAQ

Where is CCSU Co-Gen-STBY Gen?
In Hartford County, Connecticut (CT). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is CCSU Co-Gen-STBY Gen?
4 MW of nameplate capacity across 4 units, as of the EIA-860M release for 2026-07.
Who owns CCSU Co-Gen-STBY Gen?
EIA-860M names Central Connecticut State University as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as CCSU Co-Gen-STBY Gen LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Central Connecticut State University here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "CCSU Co-Gen-STBY Gen LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is CCSU Co-Gen-STBY Gen still running?
EIA-860M files it as "Standby/Backup" for 2026-07. Statuses change monthly, and this page follows the monthly release.