CCSU Fuel Cell Project

CCSU Fuel Cell Project is a 1 MW natural gas power plant in Hartford County, Connecticut, operated by New Britain Renewable Energy, LLC. It has 1 generating unit here, inside ISO New England. Its unit entered service in 2012.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.4 MW
1.4 MW net summer
Generating units
1
In service
2012
Plant code
58237

Where it is

Loading map…
County
Hartford County, Connecticut
Coordinates
41.6919, -72.7611
Balancing authority
ISNE
Sector
Commercial CHP

Units, technology and status

Operator of record
New Britain Renewable Energy, LLC
Primary energy source
Natural gas
Technologies
Other Natural Gas
Status
Operating

CCSU Fuel Cell Project: FAQ

Where is CCSU Fuel Cell Project?
In Hartford County, Connecticut (CT). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is CCSU Fuel Cell Project?
1 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns CCSU Fuel Cell Project?
New Britain Renewable Energy, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as CCSU Fuel Cell Project LLC?
Probably, but the plant data does not say. It records a plant name and an operator — New Britain Renewable Energy, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "CCSU Fuel Cell Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is CCSU Fuel Cell Project still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.