East. Michigan Univ. Heating Plant

East. Michigan Univ. Heating Plant is a 8 MW natural gas power plant in Washtenaw County, Michigan, operated by East. Michigan Univ. Heating Plant. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2018.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
7.8 MW
6.8 MW net summer
Generating units
1
In service
2018
EIA plant ID
59452

Where it is

Loading map…
County
Washtenaw County, Michigan
Coordinates
42.2489, -83.6289
Balancing authority
MISO
Sector
Commercial CHP

Units, technology and status

Operator of record
East. Michigan Univ. Heating Plant
Primary energy source
Natural gas
Technologies
Natural Gas Fired Combustion Turbine
Status
Operating

Every plant East. Michigan Univ. Heating Plant reports to EIA →

East. Michigan Univ. Heating Plant: FAQ

Where is East. Michigan Univ. Heating Plant?
In Washtenaw County, Michigan (MI). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is East. Michigan Univ. Heating Plant?
8 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns East. Michigan Univ. Heating Plant?
EIA-860M names East. Michigan Univ. Heating Plant as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as East. Michigan Univ. Heating Plant LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — East. Michigan Univ. Heating Plant here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "East. Michigan Univ. Heating Plant LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is East. Michigan Univ. Heating Plant still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.