Georgia-Pacific Taylorsville Plywood

Georgia-Pacific Taylorsville Plywood is a 7 MW natural gas power plant in Smith County, Mississippi, operated by Georgia-Pacific Wood Products LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2018.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
7.2 MW
6.2 MW net summer
Generating units
1
In service
2018
EIA plant ID
61927

Where it is

Loading map…
County
Smith County, Mississippi
Coordinates
31.8372, -89.4635
Balancing authority
SOCO
Sector
Industrial CHP

Units, technology and status

Operator of record
Georgia-Pacific Wood Products LLC
Primary energy source
Natural gas
Technologies
Natural Gas Fired Combustion Turbine
Status
Operating

Every plant Georgia-Pacific Wood Products LLC reports to EIA →

Georgia-Pacific Taylorsville Plywood: FAQ

Where is Georgia-Pacific Taylorsville Plywood?
In Smith County, Mississippi (MS). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Georgia-Pacific Taylorsville Plywood?
7 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Georgia-Pacific Taylorsville Plywood?
EIA-860M names Georgia-Pacific Wood Products LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Georgia-Pacific Taylorsville Plywood LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Georgia-Pacific Wood Products LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Georgia-Pacific Taylorsville Plywood LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Georgia-Pacific Taylorsville Plywood still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.