Sherwood H Smith Jr Energy Complex

Sherwood H Smith Jr Energy Complex is a 2 GW natural gas power plant in Richmond County, North Carolina, operated by Duke Energy Progress - (NC). EIA-860M lists 11 generating units here. Its units entered service between 2001 and 2011.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
2,244.8 MW
1,883 MW net summer
Generating units
11
In service
2001–2011
EIA plant ID
7805

Where it is

Loading map…
County
Richmond County, North Carolina
Coordinates
34.8392, -79.7406
Balancing authority
CPLE
Sector
Electric Utility

Units, technology and status

Operator of record
Duke Energy Progress - (NC)
Primary energy source
Natural gas
Technologies
Natural Gas Fired Combined Cycle, Natural Gas Fired Combustion Turbine
Status
Operating

Every plant Duke Energy Progress - (NC) reports to EIA →

Sherwood H Smith Jr Energy Complex: FAQ

Where is Sherwood H Smith Jr Energy Complex?
In Richmond County, North Carolina (NC). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Sherwood H Smith Jr Energy Complex?
2 GW of nameplate capacity across 11 units, as of the EIA-860M release for 2026-07.
Who owns Sherwood H Smith Jr Energy Complex?
EIA-860M names Duke Energy Progress - (NC) as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Sherwood H Smith Jr Energy Complex LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Duke Energy Progress - (NC) here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Sherwood H Smith Jr Energy Complex LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Sherwood H Smith Jr Energy Complex still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.