Associated Electric Coop power plants
Every generating plant EIA-860M files against Associated Electric Coop for 2026-07: 9 plants, 6 GW of nameplate capacity, across 3 states and 3 energy sources.
EIA files this entity as “Associated Electric Coop, Inc”.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 9
- Nameplate capacity
- 6 GW
- States
- 3
- AR, MO, OK
- Energy sources
- 3
Associated Electric Coop plants by energy source
- Coal2 plants · 2,482 MW
- Natural gas6 plants · 3,013 MW
- Petroleum1 plants · 53 MW
Full list of Associated Electric Coop power plants
| New MadridConventional Steam Coal | Associated Electric Coop, Inc | New Madrid | 1,300 | 2 | 1972 | Operating |
| Thomas HillConventional Steam Coal | Associated Electric Coop, Inc | Randolph | 1,181.7 | 3 | 1966 | Operating |
| ChouteauNatural Gas Fired Combined Cycle | Associated Electric Coop, Inc | Mayes | 1,069.6 | 6 | 2000 | Operating |
| Dell Power StationNatural Gas Fired Combined Cycle | Associated Electric Coop, Inc | Mississippi | 679.1 | 3 | 2007 | Operating |
| St Francis Energy FacilityNatural Gas Fired Combined Cycle | Associated Electric Coop, Inc | Dunklin | 506.6 | 2 | 1999 | Operating |
| HoldenNatural Gas Fired Combustion Turbine | Associated Electric Coop, Inc | Johnson | 321.3 | 3 | 2002 | Operating |
| NodawayNatural Gas Fired Combustion Turbine | Associated Electric Coop, Inc | Nodaway | 315.6 | 2 | 1999 | Operating |
| EssexNatural Gas Fired Combustion Turbine | Associated Electric Coop, Inc | Stoddard | 121.2 | 1 | 1999 | Operating |
| UnionvillePetroleum Liquids | Associated Electric Coop, Inc | Putnam | 53.2 | 2 | 1976 | Operating |
Associated Electric Coop: FAQ
- How many power plants does Associated Electric Coop operate?
- EIA-860M lists 9 operating plants against “Associated Electric Coop, Inc” for 2026-07, totalling 6 GW of nameplate capacity in 3 states.
- Is Associated Electric Coop the owner of these plants?
- EIA-860M names one reporting entity per generator. That entity operates the plant on the survey; ownership can sit with a parent, a partnership or a tax-equity structure that the form does not record.
- Why are affiliates listed separately?
- Because EIA files them separately. Rolling subsidiaries into a parent would need an ownership map EIA-860M does not publish, so this page does not invent one.