Every generating plant operated by Chugach Electric Assn as of 2026-07: 7 plants, 1 GW of nameplate capacity, across 1 state and 3 energy sources.

Operator of record: “Chugach Electric Assn Inc”.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
7
Nameplate capacity
1 GW
States
1
AK
Energy sources
3

Chugach Electric Assn plants by energy source

  • Battery1 plants · 40 MW
  • Hydro2 plants · 64 MW
  • Natural gas4 plants · 941 MW

Full list of Chugach Electric Assn power plants

Power plants operated by Chugach Electric Assn Inc
George M Sullivan Generation Plant 22 technologiesChugach Electric Assn IncAnchorage346.951979Operating
BelugaNatural Gas Fired Combustion TurbineChugach Electric Assn IncKenai Peninsula312.461968Standby/Backup
Southcentral Power ProjectNatural Gas Fired Combined CycleChugach Electric Assn IncAnchorage203.942013Operating
Hank Nikkels Plant 12 technologiesChugach Electric Assn IncAnchorage77.931972Operating
Eklutna Hydro ProjectConventional HydroelectricChugach Electric Assn IncMatanuska Susitna44.421955Operating
International Battery Substation (IBSS)BatteriesChugach Electric Assn IncAnchorage4012024Operating
Cooper LakeConventional HydroelectricChugach Electric Assn IncKenai Peninsula19.421961Operating

Chugach Electric Assn: FAQ

How many power plants does Chugach Electric Assn operate?
7 operating plants are listed under “Chugach Electric Assn Inc” as of 2026-07, totalling 1 GW of nameplate capacity in 1 state.
Is Chugach Electric Assn the owner of these plants?
Not necessarily. Each generator has one operator of record. Ownership can sit with a parent, a partnership or a tax-equity structure that is not shown here.
Why are affiliates listed separately?
Because each is a separate operator of record. Rolling subsidiaries into a parent would need an ownership map that is not available, so this page does not invent one.