District 70 Transco Gas Pipe Line is a 2 MW power plant in Walthall County, Mississippi, operated by Transcontinental Gas PL Corp. EIA-860M lists 2 generating units here, inside MISO. Its units entered service in 1951.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 1.6 MW
- 1.4 MW net summer
- Generating units
- 2
- In service
- 1951
- EIA plant ID
- 54744
Where it is
Loading map…
- County
- Walthall County, Mississippi
- Coordinates
- 31.2479, -90.1991
- Balancing authority
- MISO
- Sector
- Commercial Non-CHP
Units, technology and status
- Operator of record
- Transcontinental Gas PL Corp
- Primary energy source
- Other
- Technologies
- All Other
- Status
- Out of service and NOT expected to return to service in next calendar year
District 70 Transco Gas Pipe Line: FAQ
- Where is District 70 Transco Gas Pipe Line?
- In Walthall County, Mississippi (MS). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is District 70 Transco Gas Pipe Line?
- 2 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
- Who owns District 70 Transco Gas Pipe Line?
- EIA-860M names Transcontinental Gas PL Corp as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as District 70 Transco Gas Pipe Line LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Transcontinental Gas PL Corp here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "District 70 Transco Gas Pipe Line LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is District 70 Transco Gas Pipe Line still running?
- EIA-860M files it as "Out of service and NOT expected to return to service in next calendar year" for 2026-07. Statuses change monthly, and this page follows the monthly release.