SC 1 Data Center, Phase 2 is a 100 MW oil-fired power plant in Santa Clara County, California, operated by Xeres Ventures LLC. It has 44 generating units here, inside CAISO. Its units entered service between 2011 and 2020.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
99.6 MW
99.6 MW net summer
Generating units
44
In service
2011–2020
Plant code
59074

Where it is

Loading map…
County
Santa Clara County, California
Coordinates
37.3617, -121.9436
Balancing authority
CISO
Sector
Commercial Non-CHP

Units, technology and status

Operator of record
Xeres Ventures LLC
Primary energy source
Petroleum
Technologies
Petroleum Liquids
Status
Standby/Backup

SC 1 Data Center, Phase 2: FAQ

Where is SC 1 Data Center, Phase 2?
In Santa Clara County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is SC 1 Data Center, Phase 2?
100 MW of nameplate capacity across 44 units, as of 2026-07.
Who owns SC 1 Data Center, Phase 2?
Xeres Ventures LLC is the operator of record. That is not always the ultimate owner.
Is this the same as SC 1 Data Center, Phase 2 LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Xeres Ventures LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "SC 1 Data Center, Phase 2 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is SC 1 Data Center, Phase 2 still running?
Its status is "Standby/Backup" as of 2026-07. Statuses change monthly, and this page is updated monthly.