Lockheed Martin Solar

Lockheed Martin Solar is a 5 MW oil-fired power plant in Orange County, Florida, operated by Lockheed Martin RMS. EIA-860M lists 9 generating units here. Its units entered service between 1998 and 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
4.9 MW
4.9 MW net summer
Generating units
9
In service
1998–2025
EIA plant ID
61694

Where it is

Loading map…
County
Orange County, Florida
Coordinates
28.5394, -81.2164
Balancing authority
FPC
Sector
Industrial Non-CHP

Units, technology and status

Operator of record
Lockheed Martin RMS
Primary energy source
Petroleum
Technologies
Petroleum Liquids, Solar Photovoltaic
Status
Standby/Backup (7) · Operating (2)

This site runs on more than one energy source. EIA-860M capacity splits: Petroleum 3 MW, Solar 2 MW. It is filed here under Petroleum, the source with the most capacity.

Every plant Lockheed Martin RMS reports to EIA →

Lockheed Martin Solar: FAQ

Where is Lockheed Martin Solar?
In Orange County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Lockheed Martin Solar?
5 MW of nameplate capacity across 9 units, as of the EIA-860M release for 2026-07.
Who owns Lockheed Martin Solar?
EIA-860M names Lockheed Martin RMS as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Lockheed Martin Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Lockheed Martin RMS here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Lockheed Martin Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Lockheed Martin Solar still running?
EIA-860M files it as "Standby/Backup" for 2026-07. Statuses change monthly, and this page follows the monthly release.