Front Street
Front Street is a 8 MW oil-fired power plant in Hampden County, Massachusetts, operated by City of Chicopee - (MA). It has 3 generating units here, inside ISO New England. Its units entered service in 1978.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 8.1 MW
- 8.4 MW net summer
- Generating units
- 3
- In service
- 1978
- Plant code
- 7396
Where it is
Loading map…
- County
- Hampden County, Massachusetts
- Coordinates
- 42.1483, -72.5911
- Balancing authority
- ISNE
- Sector
- Electric Utility
Units, technology and status
- Operator of record
- City of Chicopee - (MA)
- Primary energy source
- Petroleum
- Technologies
- Petroleum Liquids
- Status
- Operating
Front Street: FAQ
- Where is Front Street?
- In Hampden County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Front Street?
- 8 MW of nameplate capacity across 3 units, as of 2026-07.
- Who owns Front Street?
- City of Chicopee - (MA) is the operator of record. That is not always the ultimate owner.
- Is this the same as Front Street LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — City of Chicopee - (MA) here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Front Street LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Front Street still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.