Eastside WWTP

Eastside WWTP is a 5 MW oil-fired power plant in Guilford County, North Carolina, operated by City Of High Point - (NC). It has 3 generating units here. Its units entered service in 2004.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
5.4 MW
5.4 MW net summer
Generating units
3
In service
2004
Plant code
57606

Where it is

Loading map…
County
Guilford County, North Carolina
Coordinates
35.9428, -79.9089
Balancing authority
DUK
Sector
Electric Utility

Units, technology and status

Operator of record
City Of High Point - (NC)
Primary energy source
Petroleum
Technologies
Petroleum Liquids
Status
Operating

Eastside WWTP: FAQ

Where is Eastside WWTP?
In Guilford County, North Carolina (NC). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Eastside WWTP?
5 MW of nameplate capacity across 3 units, as of 2026-07.
Who owns Eastside WWTP?
City Of High Point - (NC) is the operator of record. That is not always the ultimate owner.
Is this the same as Eastside WWTP LLC?
Probably, but the plant data does not say. It records a plant name and an operator — City Of High Point - (NC) here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Eastside WWTP LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Eastside WWTP still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.