Arcadia Electric

Arcadia Electric is a 17 MW oil-fired power plant in Trempealeau County, Wisconsin, operated by City of Arcadia - (WI). EIA-860M lists 10 generating units here, inside MISO. Its units entered service between 1930 and 2007.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
16.9 MW
16.9 MW net summer
Generating units
10
In service
1930–2007
EIA plant ID
4100

Where it is

Loading map…
County
Trempealeau County, Wisconsin
Coordinates
44.2524, -91.5034
Balancing authority
MISO
Sector
Electric Utility

Units, technology and status

Operator of record
City of Arcadia - (WI)
Primary energy source
Petroleum
Technologies
Natural Gas Internal Combustion Engine, Petroleum Liquids
Status
Standby/Backup

This site runs on more than one energy source. EIA-860M capacity splits: Petroleum 11 MW, Natural gas 6 MW. It is filed here under Petroleum, the source with the most capacity.

Every plant City of Arcadia - (WI) reports to EIA →

Arcadia Electric: FAQ

Where is Arcadia Electric?
In Trempealeau County, Wisconsin (WI). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Arcadia Electric?
17 MW of nameplate capacity across 10 units, as of the EIA-860M release for 2026-07.
Who owns Arcadia Electric?
EIA-860M names City of Arcadia - (WI) as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Arcadia Electric LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — City of Arcadia - (WI) here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Arcadia Electric LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Arcadia Electric still running?
EIA-860M files it as "Standby/Backup" for 2026-07. Statuses change monthly, and this page follows the monthly release.