Planned geothermal power plants in Nevada
What EIA-860M's Planned sheet says is coming in Nevada: 1 geothermal power plants totalling 27 MW, each with the in-service year its developer reported and the construction status EIA records. A planned project is not a built one.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Planned projects
- 1
- 5 generating units
- Proposed capacity
- 27 MW
- Earliest in-service year
- 2027
- Latest in-service year
- 2027
Map of planned geothermal power plants in Nevada
Loading map…
List of planned geothermal power plants in Nevada
| Fish Lake GeothermalGeothermal | Fish Lake Geothermal LLC | Esmeralda | 26.5 | 5 | 2027 | Planned for installation |
Where they are in the build
- Planned for installation1
Planned geothermal power plants in Nevada: FAQ
- How many geothermal power plants are planned in Nevada?
- 1, for 27 MW of nameplate capacity. These are generators developers have reported to EIA, not generators that exist.
- What do the status letters mean?
- EIA files each planned generator under a status: regulatory approvals pending, under construction at or below half complete, under construction more than half complete, construction complete but not yet in commercial operation, or planned but not yet started. Each row shows its own.
- Do these projects always get built?
- No. EIA keeps a separate Canceled or Postponed sheet, and projects move between the sheets month to month. This page is the Planned sheet for 2026-07 and nothing more.