Planned hydroelectric power plants in Pennsylvania
What EIA-860M's Planned sheet says is coming in Pennsylvania: 12 hydroelectric power plants totalling 139 MW, each with the in-service year its developer reported and the construction status EIA records. A planned project is not a built one.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Planned projects
- 12
- 43 generating units
- Proposed capacity
- 139 MW
- Earliest in-service year
- 2027
- Latest in-service year
- 2031
Map of planned hydroelectric power plants in Pennsylvania
Loading map…
List of planned hydroelectric power plants in Pennsylvania
| Montgomery L&D Hydroelectric ProjectConventional Hydroelectric | Rye Development | Beaver | 20.4 | 3 | 2028 | Planned for installation |
| Emsworth L&D Hydroelectric ProjectConventional Hydroelectric | Rye Development | Allegheny | 20.4 | 3 | 2030 | Planned for installation |
| Emsworth BC Hydroelectric ProjectConventional Hydroelectric | Rye Development | Allegheny | 18.8 | 3 | 2030 | Planned for installation |
| Maxwell L&D Hydroelectric ProjectConventional Hydroelectric | Rye Development | Fayette | 12 | 2 | 2028 | Planned for installation |
| Grays Landing L&D Hydroelectric ProjectConventional Hydroelectric | Rye Development | Greene | 12 | 2 | 2028 | Planned for installation |
| Monongahela L&D4 Hydroelectric ProjectConventional Hydroelectric | Rye Development | Washington | 12 | 2 | 2028 | Planned for installation |
| Allegheny L&D2 Hydroelectric ProjectConventional Hydroelectric | Rye Development | Allegheny | 9 | 2 | 2030 | Planned for installation |
| Dashields Hydroelectric ProjectConventional Hydroelectric | Dashields Hydropower Corporations | Allegheny | 8.8 | 8 | 2030 | Regulatory approvals pending. Not under construction |
| CW Bill Young Hydropower ProjectConventional Hydroelectric | C.W. Bill Young Hydropower Group, Inc | Allegheny | 8.4 | 7 | 2031 | Regulatory approvals pending. Not under construction |
| Allegheny Lock and Dam 4Conventional Hydroelectric | Allegheny Hydro Group Lock and Dam 4, Inc | Allegheny | 6.4 | 8 | 2031 | Regulatory approvals pending. Not under construction |
| Braddock Lock and DamConventional Hydroelectric | Lock+ Hydro Friends Fund XLII, LLC | Allegheny | 5.3 | 1 | 2027 | Regulatory approvals pending. Not under construction |
| Point Marion L&D Hydroelectric ProjectConventional Hydroelectric | Rye Development | Fayette | 5 | 2 | 2028 | Planned for installation |
Where they are in the build
- Planned for installation8
- Regulatory approvals pending. Not under construction4
Planned hydroelectric power plants in Pennsylvania: FAQ
- How many hydroelectric power plants are planned in Pennsylvania?
- 12, for 139 MW of nameplate capacity. These are generators developers have reported to EIA, not generators that exist.
- What do the status letters mean?
- EIA files each planned generator under a status: regulatory approvals pending, under construction at or below half complete, under construction more than half complete, construction complete but not yet in commercial operation, or planned but not yet started. Each row shows its own.
- Do these projects always get built?
- No. EIA keeps a separate Canceled or Postponed sheet, and projects move between the sheets month to month. This page is the Planned sheet for 2026-07 and nothing more.