Planned natural gas power plants in Mississippi

What EIA-860M's Planned sheet says is coming in Mississippi: 5 natural gas power plants totalling 3 GW, each with the in-service year its developer reported and the construction status EIA records. A planned project is not a built one.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Planned projects
5
14 generating units
Proposed capacity
3 GW
Earliest in-service year
2027
Latest in-service year
2028

Map of planned natural gas power plants in Mississippi

Loading map…

List of planned natural gas power plants in Mississippi

Planned natural gas power plants in Mississippi
Vicksburg Advanced Power StationNatural Gas Fired Combined CycleEntergy Mississippi LLCWarren819.422028Under construction
Traceview Advanced Power StationNatural Gas Fired Combined CycleEntergy Mississippi LLCMadison819.422028Under construction
Delta Blues Advanced Power StationNatural Gas Fired Combined CycleEntergy Mississippi LLCWashington818.722028Regulatory approvals pending. Not under construction
New CaledoniaNatural Gas Fired Combustion TurbineTennessee Valley AuthorityLowndes50462028Planned for installation
Ergon Refining VicksburgNatural Gas Fired Combustion TurbineErgon Refining IncWarren15.822027Under construction

Where they are in the build

  • Under construction3
  • Regulatory approvals pending. Not under construction1
  • Planned for installation1

Planned natural gas power plants in Mississippi: FAQ

How many natural gas power plants are planned in Mississippi?
5, for 3 GW of nameplate capacity. These are generators developers have reported to EIA, not generators that exist.
What do the status letters mean?
EIA files each planned generator under a status: regulatory approvals pending, under construction at or below half complete, under construction more than half complete, construction complete but not yet in commercial operation, or planned but not yet started. Each row shows its own.
Do these projects always get built?
No. EIA keeps a separate Canceled or Postponed sheet, and projects move between the sheets month to month. This page is the Planned sheet for 2026-07 and nothing more.