Planned oil-fired power plants in South Carolina
What EIA-860M's Planned sheet says is coming in South Carolina: 1 oil-fired power plants totalling 114 MW, each with the in-service year its developer reported and the construction status EIA records. A planned project is not a built one.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Planned projects
- 1
- 2 generating units
- Proposed capacity
- 114 MW
- Earliest in-service year
- 2027
- Latest in-service year
- 2027
Map of planned oil-fired power plants in South Carolina
Loading map…
List of planned oil-fired power plants in South Carolina
| WinyahPetroleum Liquids | South Carolina Public Service Authority | Georgetown | 114 | 2 | 2027 | Planned for installation |
Where they are in the build
- Planned for installation1
Planned oil-fired power plants in South Carolina: FAQ
- How many oil-fired power plants are planned in South Carolina?
- 1, for 114 MW of nameplate capacity. These are generators developers have reported to EIA, not generators that exist.
- What do the status letters mean?
- EIA files each planned generator under a status: regulatory approvals pending, under construction at or below half complete, under construction more than half complete, construction complete but not yet in commercial operation, or planned but not yet started. Each row shows its own.
- Do these projects always get built?
- No. EIA keeps a separate Canceled or Postponed sheet, and projects move between the sheets month to month. This page is the Planned sheet for 2026-07 and nothing more.