GCC Trident Solar Project
GCC Trident Solar Project is a 4 MW solar farm in Gallatin County, Montana, operated by GCC Trident LLC. It has 2 generating units here. Its units entered service between 2022 and 2025.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 4 MW
- 4 MW net summer
- Generating units
- 2
- In service
- 2022–2025
- Plant code
- 68260
Where it is
Loading map…
- County
- Gallatin County, Montana
- Coordinates
- 45.9373, -111.4637
- Balancing authority
- NWMT
- Sector
- Industrial Non-CHP
Units, technology and status
- Operator of record
- GCC Trident LLC
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
GCC Trident Solar Project: FAQ
- Where is GCC Trident Solar Project?
- In Gallatin County, Montana (MT). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is GCC Trident Solar Project?
- 4 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns GCC Trident Solar Project?
- GCC Trident LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as GCC Trident Solar Project LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — GCC Trident LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "GCC Trident Solar Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is GCC Trident Solar Project still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.