Horn Rapids Solar, Storage and Training

Horn Rapids Solar, Storage and Training is a 4 MW solar farm in Benton County, Washington, operated by Energy Northwest. EIA-860M lists 2 generating units here. Its units entered service in 2020.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
4.2 MW
4.2 MW net summer
Generating units
2
In service
2020
EIA plant ID
64198

Where it is

Loading map…
County
Benton County, Washington
Coordinates
46.3529, -119.3222
Balancing authority
BPAT
Sector
Electric Utility

Units, technology and status

Operator of record
Energy Northwest
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 3 MW, Battery 1 MW. It is filed here under Solar, the source with the most capacity.

Every plant Energy Northwest reports to EIA →

Horn Rapids Solar, Storage and Training: FAQ

Where is Horn Rapids Solar, Storage and Training?
In Benton County, Washington (WA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Horn Rapids Solar, Storage and Training?
4 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Horn Rapids Solar, Storage and Training?
EIA-860M names Energy Northwest as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Horn Rapids Solar, Storage and Training LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Energy Northwest here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Horn Rapids Solar, Storage and Training LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Horn Rapids Solar, Storage and Training still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.