Cedar Point Wind

Cedar Point Wind is a 252 MW wind farm in Lincoln County, Colorado, operated by Cedar Point LLC. It has 1 generating unit here. Its unit entered service in 2011.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
252 MW
252 MW net summer
Generating units
1
In service
2011
Plant code
57315

Where it is

Loading map…
County
Lincoln County, Colorado
Coordinates
39.4218, -103.6781
Balancing authority
PSCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Cedar Point LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Cedar Point Wind: FAQ

Where is Cedar Point Wind?
In Lincoln County, Colorado (CO). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Cedar Point Wind?
252 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Cedar Point Wind?
Cedar Point LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Cedar Point Wind LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Cedar Point LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Cedar Point Wind LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Cedar Point Wind still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.