Antrim Wind
Antrim Wind is a 29 MW wind farm in Hillsborough County, New Hampshire, operated by Antrim Wind Energy LLC. It has 1 generating unit here, inside ISO New England. Its unit entered service in 2019.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 28.8 MW
- 28.8 MW net summer
- Generating units
- 1
- In service
- 2019
- Plant code
- 59953
Where it is
Loading map…
- County
- Hillsborough County, New Hampshire
- Coordinates
- 43.0644, -72.0063
- Balancing authority
- ISNE
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Antrim Wind Energy LLC
- Primary energy source
- Wind
- Technologies
- Onshore Wind Turbine
- Status
- Operating
Antrim Wind: FAQ
- Where is Antrim Wind?
- In Hillsborough County, New Hampshire (NH). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Antrim Wind?
- 29 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns Antrim Wind?
- Antrim Wind Energy LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Antrim Wind LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Antrim Wind Energy LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Antrim Wind LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Antrim Wind still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.