Antrim Wind

Antrim Wind is a 29 MW wind farm in Hillsborough County, New Hampshire, operated by Antrim Wind Energy LLC. It has 1 generating unit here, inside ISO New England. Its unit entered service in 2019.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
28.8 MW
28.8 MW net summer
Generating units
1
In service
2019
Plant code
59953

Where it is

Loading map…
County
Hillsborough County, New Hampshire
Coordinates
43.0644, -72.0063
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Antrim Wind Energy LLC
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Antrim Wind: FAQ

Where is Antrim Wind?
In Hillsborough County, New Hampshire (NH). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Antrim Wind?
29 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Antrim Wind?
Antrim Wind Energy LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Antrim Wind LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Antrim Wind Energy LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Antrim Wind LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Antrim Wind still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.