Northwest Ohio Wind
Northwest Ohio Wind is a 110 MW wind farm in Paulding County, Ohio, operated by Northwest Ohio Wind, LLC. EIA-860M lists 3 generating units here, inside PJM. Its units entered service between 2018 and 2021.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 109.8 MW
- 104.8 MW net summer
- Generating units
- 3
- In service
- 2018–2021
- EIA plant ID
- 59296
Where it is
Loading map…
- County
- Paulding County, Ohio
- Coordinates
- 41.0169, -84.5936
- Balancing authority
- PJM
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Northwest Ohio Wind, LLC
- Primary energy source
- Wind
- Technologies
- Batteries, Onshore Wind Turbine, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. EIA-860M capacity splits: Wind 105 MW, Solar 4 MW, Battery 1 MW. It is filed here under Wind, the source with the most capacity.
Northwest Ohio Wind: FAQ
- Where is Northwest Ohio Wind?
- In Paulding County, Ohio (OH). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Northwest Ohio Wind?
- 110 MW of nameplate capacity across 3 units, as of the EIA-860M release for 2026-07.
- Who owns Northwest Ohio Wind?
- EIA-860M names Northwest Ohio Wind, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Northwest Ohio Wind LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Northwest Ohio Wind, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Northwest Ohio Wind LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Northwest Ohio Wind still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.