Tooele Army Depot(CSG)
Tooele Army Depot(CSG) is a 7 MW wind farm in Tooele County, Utah, operated by Tooele Army Depot. EIA-860M lists 5 generating units here. Its units entered service between 2010 and 2025.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 7.2 MW
- 5.8 MW net summer
- Generating units
- 5
- In service
- 2010–2025
- EIA plant ID
- 59817
Where it is
Loading map…
- County
- Tooele County, Utah
- Coordinates
- 40.503, -112.3706
- Balancing authority
- PACE
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Tooele Army Depot
- Primary energy source
- Wind
- Technologies
- Batteries, Onshore Wind Turbine, Solar Photovoltaic, Solar Thermal without Energy Storage
- Status
- Out of service and NOT expected to return to service in next calendar year (4) · Operating (1)
This site runs on more than one energy source. EIA-860M capacity splits: Wind 3 MW, Solar 3 MW, Battery 1 MW. It is filed here under Wind, the source with the most capacity.
Tooele Army Depot(CSG): FAQ
- Where is Tooele Army Depot(CSG)?
- In Tooele County, Utah (UT). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Tooele Army Depot(CSG)?
- 7 MW of nameplate capacity across 5 units, as of the EIA-860M release for 2026-07.
- Who owns Tooele Army Depot(CSG)?
- EIA-860M names Tooele Army Depot as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Tooele Army Depot(CSG) LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Tooele Army Depot here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Tooele Army Depot(CSG) LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Tooele Army Depot(CSG) still running?
- EIA-860M files it as "Out of service and NOT expected to return to service in next calendar year" for 2026-07. Statuses change monthly, and this page follows the monthly release.