Palouse

Palouse is a 105 MW wind farm in Whitman County, Washington, operated by Onward Energy. EIA-860M lists 1 generating unit here. Its unit entered service in 2012.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
105.3 MW
105.3 MW net summer
Generating units
1
In service
2012
EIA plant ID
57530

Where it is

Loading map…
County
Whitman County, Washington
Coordinates
47.1558, -117.3644
Balancing authority
AVA
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Onward Energy
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Onward Energy reports to EIA →

Palouse: FAQ

Where is Palouse?
In Whitman County, Washington (WA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Palouse?
105 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Palouse?
EIA-860M names Onward Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Palouse LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Onward Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Palouse LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Palouse still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.