Linden Wind Energy Project

Linden Wind Energy Project is a 50 MW wind farm in Klickitat County, Washington, operated by Los Angeles Department of Water & Power. EIA-860M lists 1 generating unit here. Its unit entered service in 2010.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
50 MW
50 MW net summer
Generating units
1
In service
2010
EIA plant ID
57635

Where it is

Loading map…
County
Klickitat County, Washington
Coordinates
45.7442, -120.7836
Balancing authority
BPAT
Sector
Electric Utility

Units, technology and status

Operator of record
Los Angeles Department of Water & Power
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Los Angeles Department of Water & Power reports to EIA →

Linden Wind Energy Project: FAQ

Where is Linden Wind Energy Project?
In Klickitat County, Washington (WA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Linden Wind Energy Project?
50 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Linden Wind Energy Project?
EIA-860M names Los Angeles Department of Water & Power as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Linden Wind Energy Project LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Los Angeles Department of Water & Power here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Linden Wind Energy Project LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Linden Wind Energy Project still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.