Cedar Ridge

Cedar Ridge is a 68 MW wind farm in Fond Du Lac County, Wisconsin, operated by Wisconsin Power & Light Co. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2008.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
67.7 MW
67.7 MW net summer
Generating units
1
In service
2008
EIA plant ID
56347

Where it is

Loading map…
County
Fond Du Lac County, Wisconsin
Coordinates
43.6926, -88.3297
Balancing authority
MISO
Sector
Electric Utility

Units, technology and status

Operator of record
Wisconsin Power & Light Co
Primary energy source
Wind
Technologies
Onshore Wind Turbine
Status
Operating

Every plant Wisconsin Power & Light Co reports to EIA →

Cedar Ridge: FAQ

Where is Cedar Ridge?
In Fond Du Lac County, Wisconsin (WI). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Cedar Ridge?
68 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Cedar Ridge?
EIA-860M names Wisconsin Power & Light Co as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Cedar Ridge LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Wisconsin Power & Light Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Cedar Ridge LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Cedar Ridge still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.