Roadrunner Solar and BESS

Roadrunner Solar and BESS is a 470 MW battery storage project in Cochise County, Arizona, operated by Clenera LLC. It has 2 generating units here. Its units entered service between 2025 and 2026.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
470 MW
470 MW net summer
Generating units
2
In service
2025–2026
Plant code
67823

Where it is

Loading map…
County
Cochise County, Arizona
Coordinates
32.0861, -109.9353
Balancing authority
WALC
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Clenera LLC
Primary energy source
Battery
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Battery 235 MW, Solar 235 MW. It is listed here under Battery, the energy source with the most capacity.

Roadrunner Solar and BESS: FAQ

Where is Roadrunner Solar and BESS?
In Cochise County, Arizona (AZ). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Roadrunner Solar and BESS?
470 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Roadrunner Solar and BESS?
Clenera LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Roadrunner Solar and BESS LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Clenera LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Roadrunner Solar and BESS LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Roadrunner Solar and BESS still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.