Roadrunner Solar and BESS
Roadrunner Solar and BESS is a 470 MW battery storage project in Cochise County, Arizona, operated by Clenera LLC. It has 2 generating units here. Its units entered service between 2025 and 2026.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 470 MW
- 470 MW net summer
- Generating units
- 2
- In service
- 2025–2026
- Plant code
- 67823
Where it is
Loading map…
- County
- Cochise County, Arizona
- Coordinates
- 32.0861, -109.9353
- Balancing authority
- WALC
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Clenera LLC
- Primary energy source
- Battery
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. Capacity splits: Battery 235 MW, Solar 235 MW. It is listed here under Battery, the energy source with the most capacity.
Roadrunner Solar and BESS: FAQ
- Where is Roadrunner Solar and BESS?
- In Cochise County, Arizona (AZ). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Roadrunner Solar and BESS?
- 470 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Roadrunner Solar and BESS?
- Clenera LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Roadrunner Solar and BESS LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Clenera LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Roadrunner Solar and BESS LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Roadrunner Solar and BESS still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.