LeConte Energy Storage

LeConte Energy Storage is a 125 MW battery storage project in Imperial County, California, operated by LeConte Energy Storage, LLC. It has 1 generating unit here, inside CAISO. Its unit entered service in 2022.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
125 MW
125 MW net summer
Generating units
1
In service
2022
Plant code
64701

Where it is

Loading map…
County
Imperial County, California
Coordinates
32.6772, -115.6702
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
LeConte Energy Storage, LLC
Primary energy source
Battery
Technologies
Batteries
Status
Operating

LeConte Energy Storage: FAQ

Where is LeConte Energy Storage?
In Imperial County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is LeConte Energy Storage?
125 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns LeConte Energy Storage?
LeConte Energy Storage, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as LeConte Energy Storage LLC?
Probably, but the plant data does not say. It records a plant name and an operator — LeConte Energy Storage, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "LeConte Energy Storage LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is LeConte Energy Storage still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.