Tierra Buena Energy Storage
Tierra Buena Energy Storage is a 5 MW battery storage project in Sutter County, California, operated by VESI 10 LLC. EIA-860M lists 2 generating units here, inside CAISO. Its units entered service in 2022.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 5 MW
- 5 MW net summer
- Generating units
- 2
- In service
- 2022
- EIA plant ID
- 64743
Where it is
Loading map…
- County
- Sutter County, California
- Coordinates
- 39.1713, -121.6621
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- VESI 10 LLC
- Primary energy source
- Battery
- Technologies
- Batteries
- Status
- Operating
Tierra Buena Energy Storage: FAQ
- Where is Tierra Buena Energy Storage?
- In Sutter County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Tierra Buena Energy Storage?
- 5 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
- Who owns Tierra Buena Energy Storage?
- EIA-860M names VESI 10 LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Tierra Buena Energy Storage LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — VESI 10 LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Tierra Buena Energy Storage LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Tierra Buena Energy Storage still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.